1. Reconstruction Of The Storm Sewage System After The 2024 Flood Is Located At The Stadium In Kłodzko, 57-300 Kłodzko, Ul. Kusocińskiego, Mainly On Plot No. 1/4, Am-2, Rev. 0012 Stadium, Registration Unit 020802_1, Kłodzko-Miasto. The Scope Of Works Includes Reconstruction Of The Existing Sewage System Along With Connecting Existing Connections And Connecting To The Existing Storm Sewage System. The Scope Of Construction Works Includes: A. Cutting Down Greenery That Interferes With The Designed Facilities. The Contractor Applies To The District Office In Kłodzko For Cutting Down The Conflicting Trees. It Is Necessary To Cut Down All Trees Along The Court Alley Next To The Artificial Turf Pitch Under Construction. B. Demolition Of: - The Surface Of Pedestrian And Pedestrian Routes Together With The Edges And Curbs In The Area Of Works Performed, - Demolition Of Other Elements Colliding In The Area Of Works Performed, Elements From The Demolition Should Be Treated As Waste, Apart From The Elements Indicated By The Investor For Storage. All Waste Generated As A Result Of The Work Carried Out Will Be Managed By The Contractor In Accordance With The Act Of December 14, 2012 (Journal Of Laws Of 2013, Item 21) On Waste. C. Reconstruction Of The Sewage System In Accordance With The Attached Documentation, Along With Branches And Connection Of The Sewage System At The Courts And Playing Field Under Construction (Under Construction In Separate Tasks). D. Tidying Up The Area After Installing The Sewage System And Leveling The Area Around The Designed Facilities, Topsoiling The Entire Construction Area. E. Repair And Reconstruction Of The Demolished Surface And Edges, Pedestrian And Pedestrian Routes After The Completed Works. Reconstruction Of Pedestrian And Road Routes. Details Regarding Individual Elements Of The Above-Mentioned Scope Of Works Are Detailed In The Design Documentation Attached To The Swz. The Contractor Whose Offer Is Selected As The Most Advantageous Will Be Obliged To Submit Bid Cost Estimates (If They Do Not Attach Them To The Offer) And A Work Schedule No Later Than 14 Days After Signing The Contract With The Ordering Party. The Cost Estimate And Work Schedule Should Be Prepared In A Simplified Form In Accordance With The Presented By The Ordering Party In A Bill Of Quantities - Constituting An Attachment To The Swz. The Contractor Should Familiarize Himself With The Construction Site In Order To Determine The Full Scope Of Works And Make A Correct And Complete Valuation Of The Works For The Entire Task - Optional.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.