Part 1 - Reconstruction Of The Mens Locker Room Complex, Including Replacing The Electrical, Water And Sewage Installations And Adapting The Internal Ramp, Includes: 1. Construction Works, Including: Preparatory And Demolition Works (Parts Of Partition Walls, Cutting Off Tiles, Terracotta, Dismantling Interior Doors, Fittings), Forging A New Door Opening, Preparing The Ground For A New Floor In Accordance With The Documentation, Repairs After Grouting For Electrical And Water Installations, Building Walls In Accordance With The Documentation With Plastering, Plastering Twice And Painting The Walls With Paints Above The Glaze, Construction Of Structures, Assembly Shower Walls Made Of Hpl Boards With Stainless Steel Fittings, Installation Of Internal Doors, Construction Of A Toilet For Disabled People With Equipment, Construction And Equipment Of An Additional Room, I.E. A Cleaning Room, Laying Tiles And Terracotta, Etc., Installation Of A Balustrade.2. Electrical Works, Including: Preparatory Works And Dismantling, Replacement Of The Switchgear Serving The Cloakroom Complex With Overvoltage Of Existing Circuits Going To The Switchboard, Power Supply From The Main Switchboard And Its Accessories, Replacement Of Installation Equipment And Lighting Fixtures, Installation Of A Call System, Emergency Lighting, Plug-In Sockets, Anti-Shock Protection, Tests And Measurements, Etc.3. Sanitary Works, Including: Preparatory Works And Dismantling, Construction Of A New Water And Sewage Installation In Accordance With The Documentation And Replacement Of Washbasins, Toilet Bowls, Shower Trays With Adaptation To The New Room Arrangement, Replacement Of Radiators, Etc. Note: The Order Does Not Cover Works In The Room Marked No. 2 In The Mens Locker Room With The Equipment, As Well As The Womens Locker Room (All Industries), Construction Of A Ramp Inside The Building And Additional Doors In The Gym Room.