The Subject Of The Order Includes Comprehensive Thermal Modernization Of The Building, Including Deep Thermal Modernization Of The External Partitions And Replacement Of The Structure And Roof Covering Along With The Roofing Of The Entrance To The Building. The Investment Involves Improving Energy Efficiency By Insulating The Walls And Ceiling (Mineral Wool), Replacing Window Frames, And Installing A Photovoltaic Installation. A Detailed Description Of The Subject Of The Order Is Included In The Design Documentation Attached To The Swz. The Bills Of Quantities Are Illustrative, Facilitating Calculation Work, But All Works Should Be Priced Based On The Attached Design. The Works Should Be Performed In Accordance With The Provisions Of The Act Of July 7, 1994, Construction Law, And The Materials Used Should Meet The Requirements Specified In Art. 10 Of The Act. The Works Will Be Performed On Active Property. During The Implementation Of Work, Order And Principles Of Social Coexistence Must Be Observed. The Building Is Inhabited.Note:1. Before Submitting The Offer, The Contractor Should Visit The Site In Order To Become Familiar With The Actual Situation, The Specificity Of The Facility And The Exact Scope Of Work - The Ordering Party Requires The Contractor To Visit The Site.2. The Works Must Be Performed In Accordance With Applicable Regulations, Construction Practice And Maintaining High Aesthetic Standards, Taking Into Account The Nature Of The Facility. 3. Carry Out Construction Works In Accordance With The Requirements Of Stwiorb4. In The Event Of Occupation Of Private Land (Plots) During The Investment, The Contractor Shall Bear All Costs Related To The Occupied Land.5. Carry Out Preparatory Work, Organize Technical And Social Facilities And The Construction Site, As Well As All Accompanying Works Necessary For The Comprehensive Implementation Of The Subject Of The Contract.7. Prepare The Final Settlement Of The Works And Prepare An Acceptance Report, Which Is To Include: A Contract, An Offer, Contracts With Subcontractors, An As-Built Cost Estimate Along With A Priced List Of Settlement Elements, Work Acceptance Reports, An Insurance Policy, A Handover Report Of The Construction Site, And A Statement From The Construction Manager On The Execution Of The Works In Accordance With The Regulations. The Acceptance Report Should Be Submitted In Two Copies In Paper Version And 1 Copy In Electronic Version (In *.Pdf Format)
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.