Tenders Are Invited For Construction Of A Publicly Accessible And Non-Commercial Playground In Zielonka As An Element Of Tourist And Recreational Infrastructure
Tenders Are Invited For Construction Of A Publicly Accessible And Non-Commercial Playground In Zielonka As An Element Of Tourist And Recreational Infrastructure
1. The Subject Of The Order Is The Construction Of A Publicly Accessible And Non-Commercial Playground In Zielonka As An Element Of Tourist And Recreational Infrastructure, As Part Of The Task: Construction Of A New Playground For Younger Children In The Poligon Estate. Existing Land Development Status: The Investment Area Is Located In A Green Area, Between Residential And Multi-Family Buildings And A New Multi-Purpose Sports Field. There Is A Garbage Shelter Nearby. Currently, The Area Is Used As A Football Pitch. There Are Two Goals And A Ball Catcher On The Premises. The Area Is Covered With Grass And Trees. Designed Land Development - Scope Of Works: 1) Preparatory Works; 2) Demolition Work: Dismantle Together With The Foundations And Remove 2 Handball Goals And A Ball Catcher From The Construction Site; 3) Sidewalks; 4) Safe Playground Surface - Sand; 5) Playground Fencing; 6) Landscaping Elements That Are Not Play Equipment: Bench With Backrest 3 Pcs., Information Board With Regulations 1 Pc., Bicycle Rack 3 Pcs., Waste Bin 1 Pc., Library 1 Pc.; 7) Elements Of Small Architecture - Play Equipment: Sandbox 1 Pc, Ship Play Set 1 Pc, Swing Stork Nest + Bucket + Bench 1 Pc, Swing Mother And Child 1 Pc, Rocker Motorcycle 1 Pc, Rocker Bee 1 Pc, Table With Benches 1 Pc; 8) Tree Plantings 7 Pcs; 9) Planting Shrubs 136 Pcs; 10) The Contractor Will Be Obliged To Provide The Ordering Party With Certificates Of Compliance With The Pn-En 1176:2017-12 And Pn-En 1176:2014-11 Standards Or Equivalent For Playground Equipment Before Their Installation; 11) Post-Construction Inspection Of The Playground: After Completion Of Construction Works, The Contractor Is Obliged To Commission An Inspection Of The Playground By A Certified Company At His Own Expense, Along With Presenting A Report And An Inspection Certificate With A Result Of Min. Good. Carrying Out A Post-Construction Inspection Of The Playground Carried Out By An Inspection Body That Meets The Requirements Of The Pn-En Iso/Iec 17020:2012 Compliance Assessment Standard; 12) Cleaning Works; 13) Geodetic Delineation. Note: In The Offer Form, Contractors Are Obliged To Provide The Name Of The Manufacturer Of The Offered Playground Equipment Indicated In Point. 8.5.2. Opz And Elements Of Small Architecture That Are Not Play Equipment Indicated In Point 8.5.1. Opz. Place Of Task Implementation: 05-220 Zielonka, Ul. Wyszyńskiego, Plot No. 9/249, Precinct 5-50-01. The Ordering Party Informs That Planting Care Is Not Included In The Scope Of The Order. A Detailed Description Of The Subject Of The Order, Scope And Conditions Of Implementation Is Included In The Design Documentation Prepared By Woźnicki Zdanowicz Architekci (Annex No. 8 To Swz), Consisting Of: - Land Development Design, - Technical Specifications For The Execution And Acceptance Of Construction Works. 2. The Task Is Co-Financed Under The Strategic Plan For The Common Agricultural Policy For 2023-2027 As Part Of The Intervention I.13.1 Leader/Co
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.