Bids Are Invited For “Engineering Studies For The Construction Of The Entrance Overpassage Of José María Becerra Street, From Panamericana North (E28b), In South-North Direction, Includes Environmental And Social Management Plan, Engineering Studies For The Construction Of The Road Connector On Simón Bolivar Avenue, With Acceleration And Deceleration Lanes In The Pueblo Blanco Sector, Includes 2 Management Plan
Bids Are Invited For “Engineering Studies For The Construction Of The Entrance Overpassage Of José María Becerra Street, From Panamericana North (E28b), In South-North Direction, Includes Environmental And Social Management Plan, Engineering Studies For The Construction Of The Road Connector On Simón Bolivar Avenue, With Acceleration And Deceleration Lanes In The Pueblo Blanco Sector, Includes 2 Management Plan
“Engineering Studies For The Construction Of The Entrance Overpassage Of José María Becerra Street, From Panamericana North (E28b), In South-North Direction, Includes Environmental And Social Management Plan, Engineering Studies For The Construction Of The Road Connector On Simón Bolivar Avenue, With Acceleration And Deceleration Lanes In The Pueblo Blanco Sector, Includes 2 Management Plan
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.