Summary Of Work:The Major Items Of Work Include The Following Approximate Quantities:1. General Requirements Including Mobilization, De-Mobilization And Survey Layout Etc.2. Remove And Dispose 34M Of Existing 200Mm Dia. Storm Sewer3. Remove And Dispose Of 5 V.M Of Existing 2 Manholes Including Frame And Covers4. Remove And Dispose Of 1 Existing Curb & Gutters5. Remove And Dispose Of 3,928M3 Existing Asphalt (100Mm-120Mm Depth)6. Remove And Dispose Of / Re-Use 7,858M3 Existing Gbc (Up To 300Mm Depth; Subject To Site Conditionand Deletion)7. Remove And Dispose Of 2,046M Existing Curb & Gutters8. Remove And Dispose Of 460M3 Of Existing Concrete (150Mm -200Mm Depth; Subject To Site Conditionand Deletion)9. Remove And Dispose Of / Submit Existing 1 Fire Hydrant10. Relocate (Un-Install And Re-Install Complete) Existing 17 Light Poles (Single/Double Head)11. 18,486M3 Topsoil And Organic Material Stripping, Hauling To The Designated Area (Within 1.0Km),Stockpiling And Dispose Off (300Mm Depth; Subject To Site Conditions And Deletion; Subject To Siteconditions And Deletion)12. 31,252M3 Common Excavation Including Cut, Fills, Compaction, Hauling To The Designated Area (Within1.0Km) And Stockpiling (Subject To Site Condition And Deletion)13. 2,928M2 Of Existing Asphalt Milling (50Mm Depth)14. Supply & Install 60M, 3M Wide Trapezoidal Day Light Channel Including Class-1 Riprap, Geotextilecomplete; Subject To Site Condition And Deletion).15. Supply & Install New 1,230M, 300Mm Dia., Pvc Dr35 Sanitary Sewer (3M-5M Depth) - Shoredvertical Trench16. Supply & Install 7 New, 25.2 V.M Of Sulfate Resistance 1,200Mm Diameter Manholes17. Supply & Install 7 New Nf-80 (Floating) Manhole’S Frame & Cover C/W Final Grade Adjustment18. Tie-In 3 Connections, 300Mm Dia. New Sanitary Sewer To Existing Manholes19. Tie-In 7 Connections, 300Mm Dia. New Sanitary Sewer To Existing Manholes Including Internal Dropstructure Complete20. Maintain (Uninterrupted) Sanitary Services To All The Residents Throughout Construction And Bypasspumping Of All Sanitary Flows Including Inflow And Infiltration And Back Up Pump From Start Tillcompletion Of Project21. Supply & Install 31,746M3 Clay Complete Including Common Excavation, Cuts, Fills, Compaction,Hauling And Stockpiling (Subject To Site Condition And Deletion)22. Over Excavation And Disposal Of Approximately 910M3 Of Unsuitable Material (Subject To Sitecondition And Deletion)23. Over Excavation And Placement Of 910M3 Of Washed Rock (Subject To Site Condition And Deletion)24. Approximately 300M Of Special Foundation (1M Wide, 150Mm Depth Concrete Subject To Sitecondition And Deletion)25. Supply & Install New 1,438M Of Ultra Rib Storm Sewer 525Mm Dia. (3M-5M Depth) – Shoredvertical Trench26. Supply & Install New 332M Of Pvc Ultra X2, 750Mm Dia. (3M-5M Depth) – Shoredvertical Trench27. Supply & Install New 402M Of Pvc Ultra X2, 900Mm Dia. (3M-5M Depth) – Shoredvertical Trench28. Supply & Install 17 New, 51 V.M Of Sulfate Resistance 1,200Mm Diameter Manholes29. Supply & Install 11 New, 54.2 V.M Of Sulfate Resistance 1,500Mm Diameter Manholes30. Supply & Install 28 New Nf-80 (Floating) Manhole’S Frame & Cover C/W Final Grade Adjustment31. Tie-In 4 Connections Of 525Mm Dia. New Storm Sewer To Existing Manholes32. Supply & Install 2 New, 6.5 V.M Of Sulfate Resistance 1,200Mm Diameter Cb Manholes33. Supply & Install 64 New 610 Cb With 250Mm Dia. Leads Complete34. Supply & Install 60M New 900Mm Dia., Pvc Ultra X2 With Steel Casing Pipe 1,200Mm Dia., 12.7Mmthick Stainless Steel Casing, Spacer Bwm-R Or Equivalent As Per Manufacturer Specifications(3M - 5M Depth; Installed By Cased Boring/Augering; Subject To Site Condition And Deletion)35. Maintain (Uninterrupted) Stormwater / Drainage Throughout Construction And Bypass Pumping Of Allstormwater / Drainage Flows And Back Up Pump From Start Till Completion Of Project36. Supply & Install New 82M Of C-900, Pvc Dr18 Watermain 150Mm Dia. (3M Depth) – Shored Verticaltrench37. Supply & Install New 664M Of C-900, Pvc Dr18 Watermain 300Mm Dia. (3M Depth) – Shoredvertical Trench38. Supply And Install 7 New, 300Mm Gate Valve C/W Valve Box Complete39. Supply And Install 4 New, 150Mm Gate Valve C/W Valve Box Complete40. Supply And Install 9 New Fire Hydrant, Valve And Lead Complete41. Tie-In 4 Service Connections, 150Mm Dia. To Existing 300Mm Dia. Watermain Complete42. Tie-In 2 Connections, 300Mm Dia. New Watermain To Existing And New 300Mm Watermains Complete43. Supply And Install 9, 50Mm Dia. New Flush Point With Plug Complete44. Maintain (Uninterrupted) Water Supply To All The Residents Throughout Construction45. Supply And Install 101,790M2 New Sub-Grade Preparation (150Mm Depth; Subject To Site Conditionand Deletion)46. Reuse And Install 7,858M3 Existing Road’S Gravel Base Course (Gbc; 300Mm Depth; Subject To Sitecondition And Deletion)47. Supply And Install 25,324M3 New Gravel Base Course (Gbc; 300Mm Depth; Subject To Site Conditionand Deletion)48. Supply And Install 43,458M2 Of Cement Stabilization (25Kg/M2/300Mm)49. Supply And Install 101,790M2 Of Geotextile (16Oz/Yd2; Subject To Site Condition And Deletion)50. Supply And Install 101,790M2 Of Geogrid (Subject To Site Condition And Deletion)51. Supply And Install 59,412M2 Of New Hotmix Asphalt Concrete Paving (120 Mm Depth; Two Lifts; 70Mmand 50Mm; Subject To Site Condition And Deletion)52. Supply And Install All Pavement Markings And Signage Complete (According To Drawings 1200, 1201,1202 & 1203)53. Maintain (Uninterrupted) Access To Public And All The Residents Throughout Construction54. Supply And Install 35 New Cobra Head / Contemporary Coach / Galleon Lights Complete Complete(Subject To Site Condition And Deletion)55. Supply And Install 40M2 Retaining Wall As Per Drawing 110456. Supply And Install New 1,045M, 1.5M Wide Concrete Walk57. Supply And Install New 1,760M, 1.5M Wide Concrete Monowalk58. Supply And Install New 4,690M Of 150 Curb & 250Mm Gutter (Straight Face)59. Supply And Install New 345M, 1M Wide, 200Mm Thick V Gutter60. Supply And Install 382M2, 150Mm Thick Concrete (Subject To Site Condition And Deletion)61. Supply And Install 27,876M2 Of New Topsoil (100 Mm Depth; Subject To Site Condition And Deletion)62. Supply And Install 19,512M2 Mechanical Seeding (Subject To Site Condition And Deletion)63. Supply And Install New 8,364M2 Sod (Subject To Site Condition And Deletion)