The Existing Sewer On Simon Koopmanstraat Must Be Replaced By A Separate System (Wastewater And Rainwater Drainage) Over Approximately 1,500 Meters. Furthermore, The Road Must Be Equipped With Bicycle Lanes At A Speed Of 30 Km/H. The Paving Of The Road, Bicycle Lanes And Sidewalks Are Largely Clinkers And Tiles. The Assignment Consists Of Three Parts: 1. Create An Implementation Design (Hereinafter Referred To As: Uo) Based On The Established Final Design (Hereinafter Referred To As: Do); 2. Optimizing The Uo, Associated Bill Of Quantities, Implementation Planning, Open Budget And Submitting A Final Offer. 3. After Acceptance Of The Offer, Carrying Out Work In Accordance With Your Own Offer. The Existing Sewer On Simon Koopmanstraat Must Be Replaced By A Separate System (Wastewater And Rainwater Drainage) Over Approximately 1,500 Meters. Furthermore, The Road Must Be Equipped With Bicycle Lanes At A Speed Of 30 Km/H. The Paving Of The Road, Bicycle Lanes And Sidewalks Are Largely Clinkers And Tiles.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.