Quotation Are Invited For Replacing Of Damaged Fire Alarm Control Panel With New Including Programming, Testing And Commissioning

Tender Detail

112856524
2332601129
Self-Funded
Quotation Are Invited For Replacing Of Damaged Fire Alarm Control Panel With New Including Programming, Testing And Commissioning
NCB
Asia
Arab World1,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
14-05-2026

Work Detail

Quotation are invited for Replacing of Damaged Fire Alarm Control Panel with New including Programming, Testing and Commissioning. SPECIFICATION OF REPLACING OF DAMAGED FIRE ALARM CONTROL PANEL WITH NEWINCLUDINGPROGRAMMING, TESTING AND COMMISSIONING @ HATTA STORE A. SCOPE OF WORKS: -# THE CONTRACTOR IS REQUIRED TO QUOTE LUMP SUM PRICE FOR REPLACING OFDAMAGED FIRE ALARM CONTROL PANEL WITH NEW I NCLUDINGPROGRAMMING, TESTING AND COMMISSIONING @ HATTA STORE AND WORKSHOP# CORRECTIVE MAINTENANCE DETAILSBUILDING NAME HATTA STORE A ND WORKSHOPLOCATION/FLOOR GROUND FLOORUNIT/EQUIPMENTDESCRIPTIONFIRE ALARM SYSTEMSREPLACING OF DAMAGED FIRE ALARM CONTROL PANEL WITH NEW INCLUDINGPROGRAMMING, TESTING ANDCOMMISSIONINGDIAGNOSIS/PROBLEMIDENTIFI CATIONFACP DAMAGEDSOLUTION/ ACTIONREQUIRE FROMCONTRACTORR EPLACING OF DAMAGED FIRE ALARM CONTROL PANEL WITH NEWMATERIAL REQUIREMENT NEW FIRE ALARMCONTROL PANEL WITH ACCESSORIESQUANTITY 1 NO. QUALITY NEWADDITIONALREQUIREMENT IF ANY1. THE PARTIES SHOULD VISIT THE SITE, AND CHECK THE SYSTEMS, ASSES THEREQUIREMENT AND TO QUOT E LUMP SUMACCORDINGLY.2. THE CONTRACTOR SHALL HAVE THE APPROVAL FROM DCD FOR THE MAINTENANCEAND INSTALLATION OF FIRE PROTECTIONSYSTE MS.3. THE SYSTEMS SHALL BE MAINTAINED AS PER CIVIL DEFENSE REGULATIONS.4. IN CASE OF UN-SATISFACTORY PERFORMANCE, THE LPO WILL BE CA NCELLEDGIVING 15 DAYS# NOTICE.5. INSTALLATION TO BE CARRIED OUT IN THE PRESENCE OF DEWA STAFF ONLY.6. ALL THE MATERIALS IN GENERAL S HALL CONFIRM AS PER LATEST STANDARDSAND SHALL BE SUBMITTED TO DEWA FORENGINEERS APPROVALS7. ALL THE INSTALLATIONS SHALL BE COMPLYING WITH THE LOCAL CIVIL DEFENSEREGULATIONS AND OTHER LOCAL AUTHORITIESIF REQUIRED.8. PRIOR TO PLACING ORDER FOR ANY EQUIPMENT, THE CON TRACTOR SHALL SUBMITCOMPREHENSIVE DOCUMENTSCOMPRISING WORKING DRAWINGS, CATALOGUES AND DESCRIPTIVE LITERATURE OFCOMPONENTS, USER#S M ANUALS,MAINTENANCE MANUALS ETC., FOR ENGINEER#S STUDY AND APPROVAL.9. THE CONTRACTOR SHALL BE REQUIRED TO TRAIN AND INSTRUCT CLIENT# SPERSONNEL IN THE CORRECT USE, OPERATION ANDSUPERVISION OF THE SYSTEM, PREFERABLY PRIOR TO THE HANDING OVER OF THEPROJECT10. THE CON TRACTOR SHALL BE ENSURING THAT ALL SYSTEM COMPONENTS OFFEREDSHALL BE MANUFACTURED BY ONEMANUFACTURER WHO SHALL ALSO BE ON THE LOCAL CIVIL DEFENSE AUTHORITY#SLIST OF APPROVED MANUFACTURERS ANDESTABLISHED IN DUBAI FOR A MINIMUM OF 5 YEARS.11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SUBMITTALS OF COMPLETEDESIGN INFORMATION TO DUBAI CIVILDEFENSE AUTHORITY AND FOR OBTAINING ALL NECESSARY APPROV AL CERTIFICATESPRIOR TO THE COMMENCEMENT OF THEINSTALLATION AND UPON COMPLETION IF REQUIRED.12. ONE-YEAR WARRANTY TO BE GIVEN FOR AL L THE MATERIAL SUPPLIED BY THEPARTY AFTER TESTING AND COMMISSIONING.13. QUOTATION WILL BE SUBMITTED AS PER DEWA SPECIFICATION AND SI TESURVEY. NO CHANGES/ VARIATION WILL BEAPPLICABLE AFTER RELEASING THE PO14. PARTY SHOULD ARRANGE ALL REQUIRED ACCESSORIES, CONSUMABL ES, LABOUR,AND HIGH-LEVEL ACCESS IF REQUIRED.15. ANY CORRUPTION/ DAMAGE IN EXISTING SYSTEMS/ STRUCTURE/ PROGRAMSDURING EXECUTION OF WORK SHALL BE CLEARED BY THEPARTY.16. IF ANY PROGRAMMING IS REQUIRED THROUGH SOLE AGENT ONLY.17. ALL REQUIRED CIVIL WORK.18. CABLE 2 CORE 1.5MM FP 200 PRYSMIAN ONLY.19. FOUND ANY DEVICES FAULTY DURING TESTING AND COMMISSIONING THECONTRACTOR SHOULD PROVIDE NEW DEVI CES.# CONTRACTOR SHOULD SUBMIT MATERIAL SUBMITTAL, METHOD OF STATEMENT,RISK ASSESSMENT AND ACTION PLAN TO DEWA#S SUPERVISORAPPROVAL BEFORE CARRYING OUT THE INSTALLATION.# ALL MAINTENANCE ACTIVITIES SHALL BE PERFORMED IN PRESENCE/SUPERVISIONOF CONTRACTOR#S COMPETEN T SUPERVISOR# THE CONTRACTOR SHALL DEPLOY THE SKILLED TECHNICIANS FOR CARRY OUT THEWORKS# CONTRACTORS TO BE SUBMITTED THEIR OWN CHEC K LIST FOR CORRECTIVEMAINTENANCE FOR DEWA#S SUPERVISOR VERIFICATION AND RECORD# CONTRACTORS TO SUBMIT REQUIRE CONSUMABLE ITEMS TO CO MPLETE CORRECTIVEMAINTENANCE FOR DEWA#S SUPERVISOR VERIFICATION ANDRECORD. Qty: 1 "Replacing of Damaged Fire Alarm Control Panel with New including Programming, Testing and Commissioning" Contact: THOMASKUTTY / 503014789 Site Visit: 13.05.2026 @10:00 Payment: 100 % Payment will be made after completion of the work STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332601129)/$value

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document de83cdfd-0dd7-4789-8709-e988111979c3.pdf
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail

WhatsApp