GTR 112790385

Tenders Are Invited For Construction Of A Section Of Fire Access Road No. 9 In The Zawada Forestry - Stage Ii

ICB — International Competitive Bid Closed central europe
Tender Information
GTR Reference
112790385
Tendering Authority
Subscribe to view
Tender No
ZG.270.25.2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction Of A Section Of Fire Access Road No. 9 In The Zawada Forestry - Stage Ii
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
22-05-2026 Closed
Work Detail
The Subject Of The Order Is The Construction Of A Section Of Fire Access Road No. 9 In The Zawada Forestry - Stage Ii, At Km 0+661.19 - 1+279.40, 3.5 M Wide, Along With Passing Areas, Exits, Intersections, As Well As Carrying Out An As-Built Geodetic Inventory, In Accordance With The Design Documentation, Draft Contract, Stwiorb And Bill Of Quantities Works. Designed Structures: Roadway, Intersections, Passings And Exits With Aggregate - Wearing Course Made Of Crushed Granite Aggregate C90/3 Stabliz. Mech. 0-31.5, Thickness 10 Cm, - Foundation Made Of Crushed Granite Aggregate C90/3 Stabliz.Mech. 0/63 Thick 25 Cm, - Subfloor With Load Capacity Group G1. Roadway, Intersections, Passings And Exits Made Of Openwork Boards - Wearing Layer Made Of Double-Reinforced Yomb Openwork Slabs. 12.5 Cm With Filling Of Holes With Sand, - 2 Cm Thick Layer Of Sand Bedding, - Substructure Made Of Crushed Granite Aggregate C90/3 Stabliz.Mech. 0/63 Thick 25 Cm, - Subfloor With Load Capacity Group G1. Sides - Wearing Course Made Of Crushed Granite Aggregate C90/3 Stabliz.Mech. 0-31.5, Thickness 10 Cm, - Supplemented With Soil From The Excavation. At The End Of Stage Ii, Leveling With Aggregate Should Be Performed As For The Wearing Course In Such A Way That A Transition Surface Is Created Between The Completed Surface And The Further Course Of The Road, So That Passage By A Passenger Vehicle Is Possible. The Contractor Will Be Obliged To Report The Completion Of Construction And Obtain A Certificate Of No Grounds For Objection From The Construction Supervision. A Detailed Description Of The Subject Of The Order Is Described In Annex No. 11 Swz - Description Of The Subject Of The Order (Opz), Which Consists Of: (1) Design Documentation; (2) Technical Specification For The Execution And Acceptance Of Construction Works; (3) Bills Of Quantities, And In The Draft Contract Constituting Annex No. 9 To The Swz. The Contractor Will Be Obliged To Provide At Least A 48-Month Quality Guarantee For The Completed Construction Works, Counting From The Date Of Signing The Final Acceptance Report Of The Subject Of The Agreement. The Warranty Period Is The Criterion For Evaluating Offers Described In Chapter 14 Of The Tor.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
f4c30082-892c-4841-997f-df75527dff87.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders