Tenders Are Invited For Engineering Design Services For The Construction Of Civil Engineering Works – Development Of Design Documentation For Small Lowland Retention Facilities In The Kluczbork Forest District In The Form Of One Reservoir And 4 Damming Devices.
ICB — International Competitive Bid
Closed
central europe
Tender Information
GTR Reference
112776357
Tendering Authority
Subscribe to view
Tender No
314172-2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Engineering Design Services For The Construction Of Civil Engineering Works – Development Of Design Documentation For Small Lowland Retention Facilities In The Kluczbork Forest District In The Form Of One Reservoir And 4 Damming Devices.
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
10-06-2026
Closed
Work Detail
Engineering Design Services For The Construction Of Civil Engineering Works – Development Of Design Documentation For Small Lowland Retention Facilities In The Kluczbork Forest District In The Form Of One Reservoir And 4 Damming Devices.. The Order Was Not Divided Into Parts - Justification Is Included In The Swz. As Part Of The Design Documentation, The Contractor Is Obliged To Prepare: A Construction And Executive Design (Used, Among Others, At The Stage Of Preparing The Tender Documentation For The Performance Of Construction Works To Describe The Subject Of The Contract), Consisting, In Accordance With Applicable Regulations, Of: A) A Construction Design Taking Into Account The Specificity Of The Order, In Particular The Natural And Technical Conditions, B) An Executive Design Supplementing And Detailing The Construction Design (To The Extent And Degree Of Accuracy Necessary To Perform The Construction Works) Constituting The Basis For The Preparation Bill Of Quantities Of Construction Works, Containing Detailed Drawings And Profiles Along With A Detailed Description Of Construction And Technological Solutions, Geotechnical Research Together With An Opinion, Used To Assess The Geological And Morphological Conditions Of The Area And Being The Basis For Determining The Geotechnical Conditions For The Foundation Of Building Structures, Hydrological Documentation Being The Basis For The Dimensioning Of Hydrotechnical Structures, Bills Of Quantities With The Calculation And Summary Of The Number Of Bill Of Quantities Units Of Basic Works For Each Of The Facilities. Investor Cost Estimate Based On Prepared Bill Of Quantities With Prices Resulting From The Output Data Protocol For Cost Estimation Prepared At The Stage Of Implementation Of The Project Documentation, Stwiorb Containing Sets Of Requirements Necessary To Determine The Standard And Quality Of Work In Terms Of The Method Of Execution Of Construction Works, Properties Of Construction Products And Assessment Of Their Correctness, Preparation Of The Documentation Mentioned Above Also Includes Obtaining All Opinions, Arrangements, Permits And Administrative Decisions Resulting From Legal Provisions And Requirements For Tasks Co-Financed From Eu Funds: A) Decision On The Environmental Conditions For The Implementation Of The Project (Together With Opinions/Resolutions Of Ppis And Rdoś) Or A Decision Discontinuing The Proceedings B) Extract From The Local Spatial Development Plan C) Decision On The Conditions Of Development And Land Development/Decision On Determining The Location Of A Public Purpose Or Refusal To Issue A Decision, D) Decision On A Water Permit Based On A Prepared Report For Water Law Investigations With An Attachment: Declaration Of The Authority Responsible For Water Management E) Decision Establishing Conditions For Conducting Activities Pursuant To Art. 118 Of The Nature Protection Act, F) Notification Of Works To The Regional Directorate For Environmental Protection G) Decision On A Building Permit If The Competent Authority Issues A Decision On The Need To Conduct An Environmental Impact Assessment (Eia) And Prepare An Eia Report, The Obligation To Prepare It Rests With The Contractor. The Contractor Is Obliged To Prepare Maps For Design Purposes Taking Into Account The Scope And Specificity Of The Project Planned For Implementation, Prepared By A Surveyor With Appropriate Qualifications. Design Documentation Should Be Prepared Based On The Previously Prepared
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
1e139ef7-85b0-4123-8fe6-d33225d205d9.html
Attachments
Additional Details Available on Click