Tenders Are Invited For Pollution Tracking And Monitoring And Rehabilitation – Spch In Harbonnières (80) - Design Study And Definition Of Strategies For Dismantling Process Elements Of Electrolysis And Hydrogen Workshops And Deconstruction Of Buildings
Tenders Are Invited For Pollution Tracking And Monitoring And Rehabilitation – Spch In Harbonnières (80) - Design Study And Definition Of Strategies For Dismantling Process Elements Of Electrolysis And Hydrogen Workshops And Deconstruction Of Buildings
Pollution Tracking And Monitoring And Rehabilitation – Spch In Harbonnières (80) - Design Study And Definition Of Strategies For Dismantling Process Elements Of Electrolysis And Hydrogen Workshops And Deconstruction Of Buildings. By Official Prefectural Works Order (Apto) Of November 9, 2021 Amended By That Of February 10, 2025, The Prefect Of The Somme Contacted Ademe To Intervene On The Former Industrial Spch In Harbonnières For: - Design Study And Definition Of Strategies For Dismantling Process Elements And Deconstruction Of Electrolysis Buildings, The Hydrogen Workshop, Chlorine Production, Air Treatment : Definition Of Intervention Modalities (Building Depression, Complete Emptying, Dismantling, Sorting, Decontamination And Management Of All Installation Equipment, Diagnosis Of Mercury-Impregnated Materials In Buildings, Deconstruction Of Buildings, Management Of Materials And Waste Resulting From These Operations), Definition Of The Means And Methodology To Be Implemented, Definition Of A Timetable And Precise Costing Of The Various Operations To Be Carried Out; The Aim Of This Consultation Is To Select The Service Provider For Carrying Out The Operations Mentioned Above.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.