1. The Order In Question Regarding The Implementation Of The Investment Entitled: Construction Of A Retention Reservoir In Kończyce Is Being Implemented In The Design And Build (P+B) Formula.2. The Subject Of The Order Includes The Development Of Complete Design Documentation, Obtaining The Necessary Decisions Authorizing The Implementation Of Construction Works/Submitting Notifications And The Performance Of Construction Works For The Implementation Of The Investment Specified In Section 1 Above.3. A Detailed Description Of The Subject Of The Order And The Scope Of The Contractors Responsibilities Are Specified In The Annexes To The Swz, Including: In: 1) Functional And Utility Program With Annexes (Drawings, Arrangements, Opinions, Map, Stwiorb), Hereinafter Referred To As Pfu, Constituting Annexes No. 8.1-8.5 To The Swz, 2) Draft Provisions Of The Agreement, Hereinafter Referred To As Ppu, Constituting Annex No. 9 To The Swz. Note: In Each Place Of The Pfu And Ppu Where The Polish Standard Pn Is Indicated Or Quoted, The Ordering Party Allows For Equivalent Standards, In Accordance With Article 101, Section 4 Of The Public Procurement Law. 4. The Above-Mentioned Documents Are To Be Treated As Complementary. 5. Local Visition 1) The Ordering Party Informs That It Requires The Submission Of An Offer After The On-Site Visit. Existing Trees And Shrubs, Communication Accessibility And Existing Infrastructure Of The Area.3) The Ordering Party Informs That No Answers To Questions Will Be Provided During The Site Visit And No Reports Will Be Prepared About These Visits. The Ordering Party Sets The Dates Of The Site Visit On: May 11, 2026 At 12:00 And On May 14, 2026 At 12:00. Meeting Point: Intersection Zawiszy Czarnego Street With Onufrego Zagyła Street In The Town Of Kończyce (The Center Of Kończyce, A Chapel, At The Property Of Ul. Onufrego Zagyła 2), (Link: Https://Maps.App.Goo.Gl/J5ayhzcwd3aw5fwn8, Coordinates 50.125230, 20.021817. Contact Person On The Ordering Partys Side: Robert Doniec Or Joanna Marona Tel. 12 388 50 03 Ext. 14 Or 75 Or E-Mail:
[email protected]) During The Visit, An Attendance List Will Be Prepared, Including The Name, Address And Regon Number Of The Contractor.6. If: It Was Submitted Without An On-Site Visit If The Ordering Party Required It In The Procurement Documents.