GTR 112717952

Request For Quotation Purchase Of Construction And Plumbing Materials

ICB — International Competitive Bid Closed Central Asia
Tender Information
GTR Reference
112717952
Tendering Authority
Subscribe to view
Tender No
16958198
Financer Name
Self-Funded
Work Title
Request For Quotation Purchase Of Construction And Plumbing Materials
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Asia
Political Region
Commonwealth of Independent States, CIS
Last Date of Bid Submission
12-05-2026 Closed
Work Detail
Gaskets For Funke Fp205 Heat Exchanger Necessary For Repair Of Dhw Heat Exchangers Of Blocks 4 And 6 Gaskets For Funke Fp205 Heat Exchanger Material - Epdm Limit Temperature - 150 Degrees. C Clip-On Starting And Intermediate Delivery Of Goods At The Expense Of The Supplier’S Own Funds And On Its Own. The Customers Application Can Be Carried Out During 2026, In Parts (Partially). Delivery Of Goods Is Carried Out Within 16 Calendar Days Upon The Customer’S Request, During The Customer’S Working Hours From 9 A.M. To 6 P.M. Acceptance Of Goods Is Carried Out In The Presence Of An Official Representative Of The Supplier. The Supplier Must First Agree With The Customer On The Color Of The Goods. Before Delivery Of Goods, Agree With The Customer., Metal Housing For Power Cabinets Necessary For Connecting Additional Kitchen Equipment Metal Housing For Power Cabinets Purpose - Universal Boards With Mounting Panel Shchmp Type - Shchmp-5 Dimensions - 1000 X 650 X 300 Dimensions Of False Panel: 570X920 Delivery Of Goods At The Expense Of The Supplier’S Own Funds And On Its Own. The Customers Application Can Be Carried Out During 2026, In Parts (Partially). Delivery Of Goods Is Carried Out Within 16 Calendar Days Upon The Customer’S Request, During The Customer’S Working Hours From 9 A.M. To 6 P.M. Acceptance Of Goods Is Carried Out In The Presence Of An Official Representative Of The Supplier. The Supplier Must First Agree With The Customer On The Color Of The Goods. Before Delivery Of Goods, Agree With The Customer., Construction Rope Weight: 0.084 Kg/M Diameter Of Rope, Cable: 4.8 Mm Breaking Load: 1.4 T Rope Material: Steel Rope Construction: Double Lay Rope Laying Method: Non-Unwinding Direction Of Rope Lay: Right Level Of Balance: Straightened Rope One Sample Of The Product Is Provided To The Customer For Approval. After Which Delivery Is Carried Out. Delivery Of Goods Must Be Carried Out At The Request Of The Customer, Within 16 Calendar Days, On Weekdays From 9 A.M. To 6 P.M. Delivery Is Made At The Expense Of The Supplier’S Own Funds And At The Customer’S Territory. The Product Must Be In Its Original Packaging, Without Mechanical Damage (Chips Or Dents). Acceptance Of Goods Is Carried Out In The Presence Of An Official Representative Of The Supplier, Filter Material Polyester Density 100G/M2, Roll Filter G2 Cleaning Class G2 Density 100G/M2 Roll Width 2M Linear Meters Per Roll 50 Square Meters Per Roll 100 Material Thickness 5Mm Delivery Of Goods At The Expense Of The Supplier’S Own Funds And On Its Own. The Customers Application Can Be Carried Out During 2026, In Parts (Partially). Delivery Of Goods Is Carried Out Within 16 Calendar Days Upon The Customer’S Request, During The Customer’S Working Hours From 9 A.M. To 6 P.M. Acceptance Of Goods Is Carried Out In The Presence Of An Official Representative Of The Supplier. The Supplier Must First Agree With The Customer On The Color Of The Product. Before Delivery Of Goods, Agree With The Customer., Polyamide Rope 8 Mm Rope Lay Polyamide Rope 8 Mm Cable Lay Is A Durable Synthetic Product Made Of Polyamide (Nylon) Fibers Twisted According To The Principle Of Cable (Three-Strand) Lay. The Rope Diameter Is 8 Mm, Which Provides An Optimal Balance Of Flexibility And Strength. Polyamide Is Highly Resistant To Stretching, Abrasion, Uv Radiation And Moisture, Making The Rope Suitable For Use In Wet And Marine Environments. The Breaking Load Of The Rope Is About 800–1200 Kg (Depending On The Exact Density And Quality Of The Material), The Elongation At Break Is Up To 20–30%. The Rope Remains Flexible At Low Temperatures And Is Resistant To Aggressive Media, Oils And Most Chemicals. Used In Shipping, Construction, Industry, Tourism And Household Purposes. One Sample Of The Product Is Provided To The Customer For Approval. After Which Delivery Is Carried Out. Delivery Of Goods Must Be Carried Out At The Request Of The Customer, Within 16 Calendar Days, On Weekdays From 9 A.M. To 6 P.M. Delivery Is Made At The Expense Of The Supplier’S Own Funds And At The Customer’S Territory. The Product Must Be In Its Original Packaging, Without Mechanical Damage (Chips Or Dents). Acceptance Of Goods Is Carried Out In The Presence Of An Official Representative Of The Supplier, Gaskets For Funke Fp14 Heat Exchanger Necessary For Repairing The Dhw Heat Exchanger Of Block 5 Gaskets For Funke Fp14 Heat Exchanger Material - Epdm Limit Temperature - 150 Degrees. C Clip-On Starting And Intermediate Delivery Of Goods At The Expense Of The Supplier’S Own Funds And On Its Own. The Customers Application Can Be Carried Out During 2026, In Parts (Partially). Delivery Of Goods Is Carried Out Within 16 Calendar Days Upon The Customer’S Request, During The Customer’S Working Hours From 9 A.M. To 6 P.M. Acceptance Of Goods Is Carried Out In The Presence Of An Official Representative Of The Supplier. The Supplier Must First Agree With The Customer On The Color Of The Goods. Before Delivery Of Goods, Agree With The Customer., Siphon Solo 2013 Siphon Type Purpose For Shower, For Shower Tray Connection Diameter 50 Mm, 40 Mm Material Polypropylene Delivery Of Goods At The Expense Of The Supplier’S Own Funds And On Its Own. The Customers Application Can Be Carried Out During 2026, In Parts (Partially). Delivery Of Goods Is Carried Out Within 16 Calendar Days Upon The Customer’S Request, During The Customer’S Working Hours From 9 A.M. To 6 P.M. Acceptance Of Goods Is Carried Out In The Presence Of An Official Representative Of The Supplier. The Supplier Must First Agree With The Customer On The Color Of The Goods. Before Delivery Of Goods, Agree With The Customer., Bench Hammer 300 Grams Hammer Type Locksmith Hammer Type Striker Shape Is Square Striker Weight0.3 Kg Handle Material: Wood Delivery Of Goods At The Expense Of The Supplier’S Own Funds And On Its Own. The Customers Application Can Be Carried Out During 2026, In Parts (Partially). Delivery Of Goods Is Carried Out Within 16 Calendar Days Upon The Customer’S Request, During The Customer’S Working Hours From 9 A.M. To 6 P.M. Acceptance Of Goods Is Carried Out In The Presence Of An Official Representative Of The Supplier. The Supplier Must First Agree With The Customer On The Color Of The Goods. Before Delivery Of Goods, Agree With The Customer.
Key Value
Tender Value
1,794,772 - KZT
Tender Documents
Global Tender Document
980da079-ab84-4175-b8a2-40f720627df1.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders