GTR 112629817
Quotation Are Invited For Replacement Of Auxb 50 & 60 Out Boiler Gas To Sh Expansion Joints At M-Station
ICB — International Competitive Bid
Closed
Asia
Tender Information
GTR Reference
112629817
Tendering Authority
Subscribe to view
Tender No
2412600727
Financer Name
Self-Funded
Work Title
Quotation Are Invited For Replacement Of Auxb 50 & 60 Out Boiler Gas To Sh Expansion Joints At M-Station
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Asia
Political Region
Arab World1,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
Last Date of Bid Submission
07-05-2026
Closed
Work Detail
Quotation Are Invited For Replacement Of Auxb 50 & 60 Out Boiler Gas To Sh Expansion Joints At M-Station, Jabel Ali. Technical And General Specification Of Outsourcing Work M Station, Jebelali Power Stationthis Document Details The Technical And Gen Eral Specifications Foroutsourcing The #Replacement Of Auxb 50 & 60 Out Boiler Gas To Shexpansion Joints# At The Jebel Ali Power Sta Tion (Japs). It Outlines Thetechnical Requirements, Scope Of Work, Warranty, Terms And Conditions,Security Permissions, And Executio N Guidelines For The Project Scheduledduring Outage Seasons In June 2026 To Sep 2026.A.#Expansion Joint Technical Specificationsthe Replacement Involves Two Sets Of Expansion Joints In Out Boiler Gasto Sh Expansion Joints Of M-Station Auxiliary Boiler 50 & 60 With Thefollowing Key Specifications:##Type####: Powerflex D, Designed For Horizontal Flanges, Suppliedopen Without Holes, Complete With Bolster Bag.##Marking###: Gt 02##Dimensions###: 25,410 Mm X 490 Mm, Width: 350+2P70 Mm##Overlap Area###: 200 Mm##Design Pressure##: 89 Mbar##Design Temperature#: 450 °C##Manufacturer##: New Componit, S.R.L.B.#Schedule & Duration:##Work Is Tentatively Scheduled Du Ring Outage Season In June 2026 Tosep 2026.(Exact Date Shall Be Informed 2 Days Prior Upon Confirmation)##Work Duration: 5 Days.C.#P Re-Bid Site Inspectioncontractors Are Required To Visit The Site Before Bidding To Understandthe Scope, Plant Access, Facilities, An D Complexities. Dewa Will Notentertain Any Claims For Additional Costs Beyond Agreed Lumpsum Po Valueduring Or After Execution.D.#Bi Dder Qualification##The Bidder Shall Have Proven Experience Of Similar Jobs And Shallsubmit Evidence As Per Dewa Requirements.E.#Sco Pe Of Workthe Contractors Responsibilities Are Mentioned Below But Not Limited:##Mobilizing Sufficient Manpower With Tools And Equi Pment.##Obtaining All Necessary Permits From Dewa Such As Permit To Work, Hotwork Permit, And Confined Space Entry Permit By Submitt Ing Methodstatements, Risk Assessments, And Toolbox Talk Reports One Day Inadvance.##Conducting Site Surveys And Safety Inspections. ##Marking And Removing Expansion Joint Flange Connections And Adjacentoverlap Areas.##Removing, Cleaning, Lubricating, And Reusing B Olts And Nuts; Cuttingjammed Bolts After Consultation With Station Engineers.##Cleaning Rust From Flange/Duct Surfaces By Mechanical Buffing.##Removing The Fabric Outer Layer And Bolster Bag/Pillow Insulation.##Cleaning The Expansion Joint Bellow Connection Duct.# #Welding Support Hooks For The Inner Bolster Casing.##Installing Bolster/Pillow Insulation And Fabric Layer Joined By Heatsealing We Lding.##Completing The Replacement With New Expansion Joints And Torquingbolts As Per Standards.##Providing All Necessary Tools, Tac Kles, And Manpower Under Contractorscope.##Final Inspection By Dewa Personnel.##Performing Housekeeping And Waste Segregation Per De Wa Safety Rules.##Submitting A Detailed Work Completion Report With All Relevantphotographs.##Demobilizing Men And Equipment After J Ob Completion.##Note: Scope Of Work Mentioned Here Only Provides A Broad Outline Ofthe Task. The Bidder Must Review The Adequacy Of The Proposed Scope Ofwork To Carry Out The Required Tasks And Add Any Additional Work Thatare Needed For Satisfactory Completion Of This Project.F.#Warranty##The Contractor Must Provide A Warranty Valid For One Year From Thedate Of Work Completion Certified By Dew A. Any Damage Or Defects Duringthis Period Must Be Repaired Promptly Without Affecting Electricity Andwater Production As Per Dewa R Equirements. ###The Contractor Must Submit The Service Entry Sheet Within 10 Days(Max) After Signing Of The Work Completion Certific Ate By Dewa Engineerg.#General Terms & Conditions##Contractors Must Visit The Site Before Bidding To Understand The Workscope, Plant Access, Facilities, And Safety Measures.##Daily Housekeeping And Proper Waste Segregation/Disposal To Dewadesignated Locations Are Mandatory.##Compliance With All Dewa Safety And Environmental Policies Isrequired.##Dewa Will Arrange Scaffolding If Needed; Contrac Tors Must Providequalified Riggers.##Work Will Be Supervised By Dewa, Adhering To Quality And Schedulerequirements.##Contractor#S Su Pervisor And Safety Officer Must Be Present Onsitethroughout The Work.##Dewa Provides Plant Electricity And Water, But Contractors A Reresponsible For Extending These To The Worksite.H.#Dewa Security Permissions##Contractors Must Submit The Following At Least Two D Ays In Advance Tothe Station Engineer Via Email To [email protected] / +971-4322-5912##Manpower Gate Pass Requests Including Det Ails Of Workmen With Valideids, Passports, Labour Cards, Photographs, And For Drivers, Validdriving Licenses And Vehicle Registratio N Certificates.##Material Gate Pass Requests For Tools, Equipment, And Consumables.##All Materials And Tools Brought Onsite Require Dewa Departmentmanager Approval And Must Be Declared At Security Gates.##Contractor Personnel Must Adhere Strictly To Dewa Security Proceduresand Restrict Presence To Working Areas.##Extension Of Working Hours Requires Dewa Site Engineer Approval Andseparate Permi Ts.##No Staff Or Vehicles Are Allowed On Premises After Business Hourswithout Departmental Approval.##Required Safety Documents And Warning Signs Must Be Displayed At Thesite At All Times. Qty: 1 Replacement Of Auxb 50 & 60 Out Boiler Gas To Sh Expansion Joints At M-Station, Jabel Ali. (For Details Refer Attached Scope Of Work And Drawings) Contact : [email protected] / +971-4322-6179 Standard Terms & Conditions 1) Prices Should Be Ddp Delivery Duty Paid At Dewa Stores. 2) Quotation To Be Submitted Only In Local Currency U.A.E Dirhams 3) Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material 4) No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company, And Your Participation In Dewa Tenders / Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest. Supplier Registration: Https://Srm.Dewa.Gov.Ae/Irj/Portal/Anonymous/Regis Tender Link : Https://Srm.Dewa.Gov.Ae/Sap/Opu/Odata/Sap/Zsrm_Rfx_Reg_Bid_Srv/Attachmentset(2412600727)/$Value
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
35b9b87c-86cd-4cbe-9549-b2aa6ebf99da.pdf
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.