GTR 112623606

Tenders Are Invited For Switchgear – Delivery, Assembly & Ibn 10Kv Switchgear At Various Locations Nap

ICB — International Competitive Bid Closed Western Europe
Tender Information
GTR Reference
112623606
Tendering Authority
Subscribe to view
Tender No
300549-2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Switchgear – Delivery, Assembly & Ibn 10Kv Switchgear At Various Locations Nap
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union,G20
Last Date of Bid Submission
05-06-2026 Closed
Work Detail
Switchgear – Delivery, Assembly & Ibn 10Kv Switchgear At Various Locations Nap. The Content Of This Tender Is The Production, Delivery, Installation And Commissioning Of Air-Insulated 10Kv Single Busbar Switchgear Based On Appendix 2, Ms Switchgear Specification. Appendices 04 To 11 Contain The Corresponding Overview Circuit Diagrams And Installation Plans. The Dimensions Of The Switchgear In The Installation Plan Are Shown As Examples. The Dimensions Specified In The Overview Diagram Must Be Adhered To And Taken Into Account In The Offer. The Existing 10Kv Switchgear Is To Be Replaced By New Air-Insulated 10Kv Single Busbar Switchgear. The Installation Takes Place In The 10Kv Room. The Client Places A New Substructure In The Cable Floor. For This Purpose, The Contractor Must Provide Appropriate Specifications Regarding Dimensions And Loads. The Contractor Must Then Install The Base Frame For The New Switchgear Onto The Substructure. These Costs Must Be Taken Into Account In The Offer. After Production And Successful Factory Acceptance Of The Switchgear, The Contractor Will Deliver, Install And Install The New Switch Panels. It Is Recommended And Advised To Inspect The Local Conditions Before Submitting An Offer. All Costs For The Contribution Must Be Taken Into Account In The Offer Price. The Switchgear Is Then Installed And Commissioned On Site. The Necessary Connections (Auxiliary Voltage, Communication) Between The Switchgear And Auxiliary Systems Must Be Supplied And Installed By The Contractor. The Assembly Of The Power Cables And Commissioning Are Carried Out By The Client. The Assembly And Commissioning Of The Switchgear Is Carried Out In Blocks. This Means That Only One Block Is Dismantled. The First Block Of The New Switchgear Will Be Installed In The Same Location. This Block Is Then Fully Commissioned. For A Period Of Approximately 2 To 3 Weeks, The Client Will Now Switch The Cables From The Old To The New Switchgear And Completely Dismantle The Old Switchgear. The Contractor Can Then Assemble The Second Block And Put It Into Operation. In The Sst Stern, It May Be Possible For The Entire Switchgear To Be Assembled In One Construction Phase. The Reduced Costs Due To Fewer Trips, Testing Effort, Etc. Must Be Stated In An Optional Position. The Contractor Must Carry Out A Pressure Calculation In The Event Of An Arc Fault, Which Shows The Necessary Pressure Relief Openings. The Contractor Must Appoint A Site Manager/Person Responsible For The Work In The Switching Stations. This Person Must Be On Site During The Work And Speak German. During The Assembly And Commissioning Period, The Client Provides A Contact Person On Site. The System Is Commissioned Together
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
294ee580-100e-4df9-a1df-0c06251637a5.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you