GTR 112623562
Tenders Are Invited For Architectural, Construction, Engineering And Inspection Services – Naty - Nouveaux Ateliers D’Yverdon / Yverdon-Les-Bains - Quality Assurance (Qa) Services For Project Management
ICB — International Competitive Bid
Closed
Western Europe
Tender Information
GTR Reference
112623562
Tendering Authority
Subscribe to view
Tender No
300819-2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Architectural, Construction, Engineering And Inspection Services – Naty - Nouveaux Ateliers D’Yverdon / Yverdon-Les-Bains - Quality Assurance (Qa) Services For Project Management
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Last Date of Bid Submission
17-06-2026
Closed
Work Detail
Architectural, Construction, Engineering And Inspection Services – Naty - Nouveaux Ateliers D’Yverdon / Yverdon-Les-Bains - Quality Assurance (Qa) Services For Project Management. The New Cff Workshops In Yverdon-Les-Bains, Dedicated Mainly To Heavy Maintenance Of The Long-Distance Train Fleet, Are Planned To Be Carried Out In Several Phases Of Work Between 2029 And 2041. They Will Include 3 New Long Tracks, A New Production And Distribution Of Energy, A Company Restaurant, Social Areas (Offices And Changing Rooms, New And Sanitized), Sanitized Production Areas In The Quadrangle And The North Halls, A New Bogie Workshop, As Well As The Development Of A Temporary Logistics Zone, To The West Of The Icn Hall. The Scope Of The Project Also Includes The Reorganization Of The Entire Track Network Located Between The Workshops And The Station, The Relocation Of The Overflow Tracks From Yverdon-Les-Bains To Bonvillars, As Well As The Relocation Of The P+Rail. It Should Be Noted That The Scope Of The Project Is Divided Into Two Stages, A First Priority Stage, Hereinafter Referred To As “Stage 1 Naty”, Autonomous And Coherent, Which Will Be Carried Out As A Priority (Horizon 2030-2040), And A Second Stage, Without Name At Present. “Stage 1 Naty” Is Itself Divided Into 4 Phases Of Work, Not To Be Confused With The Usual Sia Phases. The 4 Phases Of Work Are As Follows: · Phase 1 – C10 Long Routes, D7.2 Energies, A5 Login, Admin And Restaurant; · Phase 2 – Sanitation B2 And B2n Login, Construction Of Bogie Hall C9; · Phase 3 – Sanitation B1, B3, B4 And C1; · Phase 4 – Sanitation C2 And C7. This Contract Concerns The Quality Assurance (Qa) Services Of The Project Management. The Control Team Responsible For Qa (Qa Team) Helps The Project Management To Control The Quality Of The Planning And Construction Services Entrusted To The Partners By The Project Owner, During The Planning, Call For Tenders And Construction Phases (Sia Phases 31 To 53) For The 4 Work Phases Of “Stage 1 Naty”.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
030e2ffb-8a38-4a55-8996-915ec80f7094.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.