Part A - Salmon River Dike Upgradesraising Of The Existing 600M-Long Earth Dike By Approximately 0.9 Meters On Averageinstallation Of A Concrete And Steel Barrier System Through The Pump House Section Of The Diketie Ins To The Existing River Side Trail Network And Maintenance Access Drivewaysinstallation Of New Golf Ball Protection Fence (16-Feet Tall) Along The New Trail At Top Of Dikecut And Off-Site Removal Of Approx. 60 Trees (Diameter ≫ 300Mm) Along The Dike Alignmentother Miscellaneous And Incidental Work As Described In The Contract Documentspart B & C – Bedford Channel Bank Erosion Mitigationinstallation Of A Natural Erosion Protection System At Two Sites, Wp2 (Part B) & Wp6 (Part C – Optional Work) Along The Riverbank Adjacent To The Dike Upgrade Workinstallation Of Rock Armouring, Large Woody Material (Lwm), And Geotextile/Soil‑Wrap Systems To Repair The Eroding Riverbankvegetative Restoration Measures Including Live Staking At Maximum 0.6M Spacingto Obtain Documents, Please Visit Our Bidding System Https://Tol.Bidsandtenders.Ca. Note: In Order To Submit A Response To This Bid The Proponent Must Register As A Plan Taker For This Opportunity.Only By Being Registered, Can A Proponent Be Certain To Receive Addenda Notifications.Datesthe Township Will Not Update Bc Bid Of Any Date Changes Related To This Bid.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.