Test Drilling And Boring Work – (Provia Id 149096) Werndorf - Lebring; Double-Track Expansion; Planning. As Part Of The Double-Track Expansion Of The Southern Railway, Underground Exploration Is To Be Carried Out For The Werndorf-Lebring Section. In Order To Clarify The Subsoil And Groundwater Conditions, Core Drilling, Ramming And Exploratory Slots Are Planned. Some Of The Boreholes Will Be Converted Into Gauges Or Inclinometer Measuring Points. In Addition, An In Situ Test Program Is Planned In Selected Boreholes And Exploratory Slots. In Addition, As Part Of The Exploratory Work, An Access Road To The Öbb Route Is To Be Built At Km 79.4 Of The B67 Road. In Existing Buildings, This Route Is Intended To Be Used For Exploration For The Downstream Eia Process. These Include Ecological, Hydraulic Engineering And, If Necessary, Other Geological Investigations That Take Place On Site In This Area.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.