Quotation Are Invited For Oem-Replacement Of Compressor Shaft Seal With Complete Overhaul For York Water Cooled Chiller

Tender Detail

112470927
2332601030
Self-Funded
Quotation Are Invited For Oem-Replacement Of Compressor Shaft Seal With Complete Overhaul For York Water Cooled Chiller
NCB
Asia
Arab World1,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
05-05-2026

Work Detail

Quotation are invited for OEM-Replacement of Compressor Shaft Seal with Complete Overhaul for York Water Cooled Chiller at Ruwaiyah Garage. REPLACEMENT OF COMPRESSOR SHAFT SEAL WITH COMPLETE OVERHAUL FOR YORKWATER COOLED CHILLER AT RUWAIYAH GARAGE.# REPLACEMENT OF COMPRE SSOR SHAFT SEAL WITH COMPLETE OVERHAUL FOR YORKWATER COOLED CHILLER AT RUWAIYAH GARAGE.1. OBJECTIVETO CARRY OUT SAFE REFRIGERANT REC OVERY, COMPRESSOR DISMANTLING, SHAFTSEAL REPLACEMENT, COMPRESSOR OVERHAUL, REASSEMBLY, TESTING, ANDRECOMMISSIONING OF THE YORK WATER -COOLED CHILLER, ENSURING RESTORATIONOF LEAK-FREE AND EFFICIENT OPERATION AS PER OEM STANDARDS.2. TECHNICAL SCOPE OF WORKS2.1 PRE-CO MMISSIONING ASSESSMENT##RECORD BASELINE OPERATING PARAMETERS: SUCTION / DISCHARGE PRESSURE##OIL PRESSURE AND TEMPERATURE##MOTOR AMPE RAGE AND VOLTAGE##EVAPORATOR AND CONDENSER TEMPERATURES####CONFIRM SHAFT SEAL LEAKAGE THROUGH: VISUAL INSPECTION##OIL/REFRIGERANT TR ACES##PRESSURE DROP VERIFICATION##2.2 SYSTEM SHUTDOWN & ISOLATION##EXECUTE CONTROLLED SHUTDOWN OF CHILLER UNIT.##ELECTRICAL ISOLATIO N INCLUDING MCC PANEL DISCONNECTION.##MECHANICAL ISOLATION OF CHILLED WATER AND CONDENSER WATER LINES (IFREQUIRED).##IMPLEMENTATION OF LOCK-OUT/TAG-OUT (LOTO) PROCEDURES.2.3 REFRIGERANT PUMP-DOWN & RECOVERY##PERFORM REFRIGERANT PUMP-DOWN (IF APPLICABLE). ## RECOVER REFRIGERANT USING CERTIFIED RECOVERY UNIT COMPLIANT WITHENVIRONMENTAL STANDARDS. ## MEASURE AND RECORD RECOVERED REFRIGERANT QUANTITY. ##STORE REFRIGERANT IN APPROVED RECOVERY CYLINDERS WITH PROPERLABELING.DEWA-CONFIDENTIAL2.4 COMPRESSOR DISMANTLING ## DRAIN COMPRESSOR OIL AND STORE FOR INSPECTION. Qty: 1 OEM-Replacement of Compressor Shaft Seal with Complete Overhaul for York Water Cooled Chiller at Ruwaiyah Garage. Contact: Mohideen / 553810513 Site Vist: 04.05.2026 @ 10:00 Payment: After completion of work STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332601030)/$value

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document 5f120a72-6889-4768-b9e6-a6842db93579.pdf
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail

WhatsApp