The Work Mainly Consists Of: A. Breaking Up And Removing Existing Element Paving; B. Breaking Up And Reusing Existing Element Paving; C. Breaking Up And Removing Asphalt Pavement. D. Groundwork E. Removing Trees. F. Breaking Up Concrete Gwa Sewer System (Pipes And Wells) G. The Installation Of A Vwa Sewer System H. Installing A Hwa System (It Sewerage) I. Digging, Filling With Soil And Sowing Green Areas With Grass J.. Creating Tree Planting Areas K. Applying Elemental Paving L. Applying A Foundation Of Mixed Granulate. M. The Installation Of Asphalt Constructions N. Installing Markings And Signage O. Setting Up And Removing Temporary Depot After Work; P. Taking Traffic Measures. Q. Carrying Out Measuring Work To Check Existing Heights R. Carrying Out Measuring Work For Revision Drawings To Be Supplied, Breaking Up Elemental Paving Approx. 9,500 M2 Breaking Up Asphalt Pavement Approx. 10,000 M2 Breaking Up Main Sewer Approx. 1,600 M1 Installing It Main Sewer Concrete Approx. 1,600 M1 Pp Pipe Main Sewer Vwa Approx. 1,600 M1 Installing Elemental Paving Approx. M2 Of Asphalt Paving Approximately 12,000 Tons
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.