1. The Subject Of The Order Is: Reconstruction Of Residential Premises No. 2 In Order To Separate Two Separate Residential Premises Along With Their Renovation And Renovation Of Residential Premises No. 5 In The Building At Ul. Szkolna 19 In Szczecinek. The Scope Of Works Includes: - Premises No. 2 A - General Construction Works - Lintels, Window And Door Joinery, Demolition, Cladding And Painting, Floors And Floors, Ventilation And Flue Gas Ducts, Opening, Brickwork, Partition Walls, Plasters, Scaffolding And Security, Removal And Disposal Of Post-Demolition Materials; - Premises No. 2 - General Construction Works - Lintels, Window Joinery And Doors, Demolitions, Cladding And Painting, Floors And Coverings, Ventilation And Flue Gas Ducts, Demolition, Brickwork, Partition Walls, Plasters, Scaffolding And Protection, Removal And Disposal Of Post-Demolition Materials; - Communication - Lintels, Window Joinery, Demolition, Cladding And Painting, Removal And Disposal Of Post-Demolition Materials; - Attic Ceiling - Demolition Of Wooden And Subfloor Floors, Strengthening Of Beams, Leveling And Strengthening Of Floor And Ceiling Surfaces, Thermal And Anti-Sound Insulation, Removal And Disposal Of Post-Demolition Materials; - Sanitary And Gas Installations - Gravity Ventilation, Installations Gas, Central Heating Installation, Water And Sewage Installation, - Electrical Installation Works - Internal Installations, Security, Acceptance Tests, - Premises No. 5 - General Construction Works - Lintels, Window And Door Joinery, Plasters, Painting Works, Stitching Of Internal Walls, Floors And Floors, Scaffolding And Security, Removal And Disposal Of Post-Demolition Materials; - Sanitary And Gas Installations - Gravity Ventilation, Installation Central Heating - Partial Reconstruction Of The Installation After Dismantling The Paneling, Water And Sewage Installation, - Electrical Installation Works - Measuring Cabinet, Internal Installations, Security, Acceptance Tests.2. The Detailed Scope Of Works Is Presented: Technical Documentation, Which Consists Of: Construction Design Together With The Construction Permit Decision (In The Part Regarding Premises No. 2), Technical Specification For The Execution And Acceptance Of Works, Bill Of Quantities Constituting Annex No. 1, No. 2 And No. 3 To The Swz, Respectively.