Tenders Are Invited For Comprehensive Investment Involving The Design And Execution Of Construction Works. For The Inv. Task Mon. Construction Of A District Warehouse For Ol And Oc Resources Along With The Necessary Technical Infrastructure.
Tenders Are Invited For Comprehensive Investment Involving The Design And Execution Of Construction Works. For The Inv. Task Mon. Construction Of A District Warehouse For Ol And Oc Resources Along With The Necessary Technical Infrastructure.
1. The Order Covers The Comprehensive Implementation Of The Investment Consisting In The Design And Execution Of Construction Works For The Investment Task Titled: Construction Of A District Warehouse For Civil Protection And Civil Defense Resources Along With The Necessary Technical Infrastructure. Warehouse - A Single-Nave Hall With A Steel Structure, Placed On A Reinforced Concrete Foundation Slab, Covered With A Symmetrical Gable Roof With Skylights. Location Of The Facility: Plots No. 19/4 And 19/8, Registration Unit Of The City Of Jasło, Precinct 04 - Warehouse And Industrial District. Building Area Of The Hall - Approximately 751.90 M2, Volume Of The Hall - Approximately 3,732.64 M3.2. The Scope Of The Order Includes In Particular: 1) Development Of Multi-Discipline Design And Cost Estimate Documentation Based On The Provided Functional And Utility Program, Architectural Concept, Geological And Engineering Documentation And Geotechnical Foundation Conditions To The Extent Necessary For Approval By The Architectural And Construction Administration Body (With Obtaining The Final Decision On The Building Permit For The Ordering Party). 2) Performing Authors Supervision During The Implementation Of Works Based On The Prepared Documentation Design, As Provided For In Art. 20 Section 1 Point 4 Of The Act Of July 7, 1994 Construction Law, 3) Preparation Of An Application For A Building Permit, 4) Preparation Of A Notification To The District Construction Supervision Inspector Of The Intention To Start Construction Works, 5) Preparation Of The Construction Site, 6) Performance Of Demolition Works, 7) Postponement Of All Collisions Of The Planned Building With Networks And Technical Installations, 8) Execution Of All Connections And Technical Installations Necessary For The Use Of The Facility, 9) Construction Of A Warehouse Building In The Form Of Hall In A Steel Structure Placed On Reinforced Concrete Foundations, 10) Construction Of All Internal Installations In The Building Included In The Pfu, 11) Equipping The Warehouse Hall With Shelves, 12) Construction Of Hardened Surfaces, Maneuvering Areas And Parking Lots, 13) Construction Of Fencing Of The Facility And Control Of Entry And Entry To The Facility, 14) Performance Of Land Leveling And Development Of Green Areas, 15) Reporting The Completion Of Construction Together With Submitting The Report Collation,16) Preparation Of An Application For An Occupancy Permit To The District Construction Supervision Inspector.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.