Bids Are Invited For Price Registration For Possible And Future Contracting Of Rental Services, Installation And Removal Of Tents, Stages, Coverages, Dressing Rooms, Kitchens, Exhibitors, Ticket Offices, Aluminum Structures, Modular Floors, Stalls, Railings, Chairs And Beaches
Bids Are Invited For Price Registration For Possible And Future Contracting Of Rental Services, Installation And Removal Of Tents, Stages, Coverages, Dressing Rooms, Kitchens, Exhibitors, Ticket Offices, Aluminum Structures, Modular Floors, Stalls, Railings, Chairs And Beaches
Pavilion Tent 150 Two-Story Type, With An Asymmetrical Division, One With A Span Of 27.50 Meters And The Other With A Span Of 12.50 Meters; The Structure Will Be Composed Of Three Longitudinal Rows Of Pillars, Two At The Lateral Ends And An Intermediate One Positioned 15.00 Meters From One Of The Ends, A Configuration That Will Provide A Free Span Of Approximately 25. 00 Meters On One Side Of The Structure, Forming A Single And Continuous Coverage Over The Entire Area), Covering And Closing The Sides And Bottom In Good Quality Vinyl Canvas, Clean And Without Holes, In White With Special Treatment And Synthetic Coating, Black Out (Sunlight Retention), Anti - Mold, Anti Uv And Self Extinguishing. Ground Fixing System (Ratchet Tape) And Steel Cable Tie. Electrical Grounding Of The Entire Structure. Supply Of Art For The Entire Structure And Flame Retardant Report. The Assembly And Installation Of The Entire Structure Must Be Completed Within A Maximum Of 144 Hours (6 Calendar Days) Before The Start Of The Event And Uninstallation And Disassembly Within A Maximum Of 48 Hours After The End Of The Event. The Period Of Use Will Be For Events Of Up To 4 Days., Witch Hat Tent 10X10 Height Tent Rental In Witch Hat Format Measuring 10.00 M Vinyl In White Color With Special Treatment And Synthetic Coating, Anti-Fire, Anti-Uv And Self-Extinguishing, With Issuance Of Art And Report. The Assembly And Installation Of The Entire Structure Must Be Completed Within A Maximum Of 144 Hours (6 Calendar Days) Before The Start Of The Event And The Uninstallation And Disassembly Must Be Completed Within A Maximum Of 48 Hours After The End Of The Event. In Heavy Line Aluminum Trusses Measuring 20 Meters Long In Clear Span 1,080 M²). Covering And Closing The Sides And Bottom In Good Quality Vinyl Canvas, Anti-Uv And Self-Extinguishing. Ground Fixing System (Ratchet Tape) And Steel Cable Tie. Electrical Grounding Of The Entire Structure. Supply Of Art For The Entire Structure And Flame Retardant Report. The Assembly And Installation Of The Entire Structure Must Be Completed Within A Maximum Of 144 Hours (6 Calendar Days) Before The Start Of The Event And Uninstallation And Disassembly Within A Maximum Of 48 Hours After The End Of The Event. Period Of Use Of Up To 4 Days. Depth With Ceiling Foot Of 4 Meters High, Forming A Single Coverage Of 30M
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.