Tenders Are Invited For Construction Of 1 Concrete Road, 0.282 Km Long, 5 M Wide, 0.15 M Thick, Using 8 Mm Steel Cross Section And Filling The Red Soil, 0.30 M Wide Shoulder, Watering And Compressing With Elephant Foot Or Earth Compactor And Widening Of The Road (7 M X 3 M). 0.15 M Thick Crushed Stone (Concrete) - Concrete Work Can Use Ready-Mixed Concrete Or Concrete Mixed By Truck - 1 Project Sign And Traffic Sign (Stop) 1 Place - Concrete Road Paving Work Must Be Tied To A Width Of 0.20 Meters And A Correct Deposit Height Of 0.075 Meters - Extension Work Of 20 Meters, 14 Meters Of Cane And Canopy. 0.50 M Long And Shall Be Spaced 0.40 M Apart - Do Not Push The Cart Or Drive A Roller Coaster Or Concrete Mixer Truck Over The Width And Length Of The Steel Wire.
Tenders Are Invited For Construction Of 1 Concrete Road, 0.282 Km Long, 5 M Wide, 0.15 M Thick, Using 8 Mm Steel Cross Section And Filling The Red Soil, 0.30 M Wide Shoulder, Watering And Compressing With Elephant Foot Or Earth Compactor And Widening Of The Road (7 M X 3 M). 0.15 M Thick Crushed Stone (Concrete) - Concrete Work Can Use Ready-Mixed Concrete Or Concrete Mixed By Truck - 1 Project Sign And Traffic Sign (Stop) 1 Place - Concrete Road Paving Work Must Be Tied To A Width Of 0.20 Meters And A Correct Deposit Height Of 0.075 Meters - Extension Work Of 20 Meters, 14 Meters Of Cane And Canopy. 0.50 M Long And Shall Be Spaced 0.40 M Apart - Do Not Push The Cart Or Drive A Roller Coaster Or Concrete Mixer Truck Over The Width And Length Of The Steel Wire.
Association of Southeast Asian Nations, ASEAN,APAC (Asia Pacific)
19-05-2026
Work Detail
Construction of 1 concrete road, 0.282 km long, 5 m wide, 0.15 m thick, using 8 mm steel cross section and filling the red soil, 0.30 m wide shoulder, watering and compressing with elephant foot or earth compactor and widening of the road (7 m x 3 m). 0.15 m thick crushed stone (concrete) - Concrete work can use ready-mixed concrete or concrete mixed by truck - 1 project sign and traffic sign (stop) 1 place - Concrete road paving work must be tied to a width of 0.20 meters and a correct deposit height of 0.075 meters - Extension work of 20 meters, 14 meters of cane and canopy. 0.50 m long and shall be spaced 0.40 m apart - Do not push the cart or drive a roller coaster or concrete mixer truck over the width and length of the steel wire.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.