Tenders Are Invited For Construction Of 1 Concrete Road, Length 0.407 Km, Width 6 M, Concrete Thickness 0.20 M, Using Steel, Cross Section 12 Mm. And Fill The Red Soil Shoulder Width Of 0.5 M Wide, Be Watered And Compacted By Elephant Foot Or Soil Compactor - The Floor Should Be Paved With Clear Plastic Rubber - The First Foundation Layer Should Be Filled With 0.10 M Thick Red Gravel - The Second Foundation Layer Should Be Filled With 0.15 M Thick Concrete Paving - Concrete Work Can Be Used With Concrete Or Concrete Mix Must Be Tied To A Width Of 0.20 Meters And The Correct Placement Of The Height Of 0.10 Meters - 20 Meters Of Joint Expansion Work Must Use 14 Mm Cane Bars. 0.5 M Long And 19 Mm Pvc Pipe. 0.5 M Long And Shall Be Spaced 0.40 M Apart. - Do Not Push The Cart Or Drive A Roller Coaster Or Concrete Mixer Truck Over The Transverse And Longitudinal Steel Ropes.
Tenders Are Invited For Construction Of 1 Concrete Road, Length 0.407 Km, Width 6 M, Concrete Thickness 0.20 M, Using Steel, Cross Section 12 Mm. And Fill The Red Soil Shoulder Width Of 0.5 M Wide, Be Watered And Compacted By Elephant Foot Or Soil Compactor - The Floor Should Be Paved With Clear Plastic Rubber - The First Foundation Layer Should Be Filled With 0.10 M Thick Red Gravel - The Second Foundation Layer Should Be Filled With 0.15 M Thick Concrete Paving - Concrete Work Can Be Used With Concrete Or Concrete Mix Must Be Tied To A Width Of 0.20 Meters And The Correct Placement Of The Height Of 0.10 Meters - 20 Meters Of Joint Expansion Work Must Use 14 Mm Cane Bars. 0.5 M Long And 19 Mm Pvc Pipe. 0.5 M Long And Shall Be Spaced 0.40 M Apart. - Do Not Push The Cart Or Drive A Roller Coaster Or Concrete Mixer Truck Over The Transverse And Longitudinal Steel Ropes.
Association of Southeast Asian Nations, ASEAN,APAC (Asia Pacific)
21-05-2026
Work Detail
Construction of 1 concrete road, length 0.407 km, width 6 m, concrete thickness 0.20 m, using steel, cross section 12 mm. And fill the red soil shoulder width of 0.5 m wide, be watered and compacted by elephant foot or soil compactor - The floor should be paved with clear plastic rubber - The first foundation layer should be filled with 0.10 m thick red gravel - The second foundation layer should be filled with 0.15 m thick concrete paving - Concrete work can be used with concrete or concrete mix Must be tied to a width of 0.20 meters and the correct placement of the height of 0.10 meters - 20 meters of joint expansion work must use 14 mm cane bars. 0.5 m long and 19 mm PVC pipe. 0.5 m long and shall be spaced 0.40 m apart. - Do not push the cart or drive a roller coaster or concrete mixer truck over the transverse and longitudinal steel ropes.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.