Tenders Are Invited For Construction Of 1 Concrete Road, 0.449 Km Long, 5 M Wide, 0.15 M Thick Concrete, Using Steel, 8 Mm In Diameter, And 1 Gutter, 1 M Long, 9 M Wide, Filled With Red Soil, 0.3 M Wide, Should Be Watered And Compacted With Elephant Legs Or Earth Compactor. - The Second Foundation Layer Must Be Filled With 0.15 M Thick Concrete Paving. - Concrete Pouring Work Can Use Ready-Mixed Concrete Or Concrete Mixed By Truck. - Must Have A Project Sign In One Place. 0.5 M Long And 19 Mm Pvc Pipe. 0.5 M Long And Shall Be Spaced 0.40 M Apart - Do Not Push The Cart Or Drive A Concrete Mixer Truck Over The Horizontal And Vertical Ropes - The Recipient Must Cover The Concrete With A Sack Or Filter Cloth And Water For At Least 7 To 10 Days After Removing The Mold.
Tenders Are Invited For Construction Of 1 Concrete Road, 0.449 Km Long, 5 M Wide, 0.15 M Thick Concrete, Using Steel, 8 Mm In Diameter, And 1 Gutter, 1 M Long, 9 M Wide, Filled With Red Soil, 0.3 M Wide, Should Be Watered And Compacted With Elephant Legs Or Earth Compactor. - The Second Foundation Layer Must Be Filled With 0.15 M Thick Concrete Paving. - Concrete Pouring Work Can Use Ready-Mixed Concrete Or Concrete Mixed By Truck. - Must Have A Project Sign In One Place. 0.5 M Long And 19 Mm Pvc Pipe. 0.5 M Long And Shall Be Spaced 0.40 M Apart - Do Not Push The Cart Or Drive A Concrete Mixer Truck Over The Horizontal And Vertical Ropes - The Recipient Must Cover The Concrete With A Sack Or Filter Cloth And Water For At Least 7 To 10 Days After Removing The Mold.
Association of Southeast Asian Nations, ASEAN,APAC (Asia Pacific)
15-05-2026
Work Detail
Construction of 1 concrete road, 0.449 km long, 5 m wide, 0.15 m thick concrete, using steel, 8 mm in diameter, and 1 gutter, 1 m long, 9 m wide, filled with red soil, 0.3 m wide, should be watered and compacted with elephant legs or earth compactor. - The second foundation layer must be filled with 0.15 m thick concrete paving. - Concrete pouring work can use ready-mixed concrete or concrete mixed by truck. - Must have a project sign in one place. 0.5 m long and 19 mm PVC pipe. 0.5 m long and shall be spaced 0.40 m apart - Do not push the cart or drive a concrete mixer truck over the horizontal and vertical ropes - The recipient must cover the concrete with a sack or filter cloth and water for at least 7 to 10 days after removing the mold.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.