Tenders Are Invited For Construction Of 2 Concrete Roads, 0.462 Km Long, 5 M Wide, 0.15 M Thick Concrete, Using Steel Rods With A Diameter Of 8 Mm. And Fill The Red Soil Shoulder Width Of 0.5 M Wide, Be Watered And Compacted By Elephant Foot Or Soil Compactor - The Floor Should Be Paved With Clear Plastic Rubber - The First Foundation Layer Should Be Filled With Red Gravel 0.1 M Thick - The Second Foundation Layer Should Be Filled With 0.1 M Thick Concrete Paving - Concrete Pouring Work Can Be Done Tie A 0.2-Meter-Wide Piece Of Steel And Place The Correct Deposit At A Height Of 0.075 Meters Of Concrete Thickness. 0.5 M Long And 19 Mm Pvc Pipe. 0.5 M Long And 0.4 M Apart - Do Not Push The Cart Or Drive A Concrete Mixer Truck Over The Steel Wire That Is Tied Across The Length And Width - Recipients Must Be Watered For At Least 7 To 10 Days After Removing The Molded Board Or Covered With Concrete Bag After 7 To 10 Days.
Tenders Are Invited For Construction Of 2 Concrete Roads, 0.462 Km Long, 5 M Wide, 0.15 M Thick Concrete, Using Steel Rods With A Diameter Of 8 Mm. And Fill The Red Soil Shoulder Width Of 0.5 M Wide, Be Watered And Compacted By Elephant Foot Or Soil Compactor - The Floor Should Be Paved With Clear Plastic Rubber - The First Foundation Layer Should Be Filled With Red Gravel 0.1 M Thick - The Second Foundation Layer Should Be Filled With 0.1 M Thick Concrete Paving - Concrete Pouring Work Can Be Done Tie A 0.2-Meter-Wide Piece Of Steel And Place The Correct Deposit At A Height Of 0.075 Meters Of Concrete Thickness. 0.5 M Long And 19 Mm Pvc Pipe. 0.5 M Long And 0.4 M Apart - Do Not Push The Cart Or Drive A Concrete Mixer Truck Over The Steel Wire That Is Tied Across The Length And Width - Recipients Must Be Watered For At Least 7 To 10 Days After Removing The Molded Board Or Covered With Concrete Bag After 7 To 10 Days.
Association of Southeast Asian Nations, ASEAN,APAC (Asia Pacific)
11-05-2026
Work Detail
Construction of 2 concrete roads, 0.462 km long, 5 m wide, 0.15 m thick concrete, using steel rods with a diameter of 8 mm. And fill the red soil shoulder width of 0.5 m wide, be watered and compacted by elephant foot or soil compactor - The floor should be paved with clear plastic rubber - The first foundation layer should be filled with red gravel 0.1 m thick - The second foundation layer should be filled with 0.1 m thick concrete paving - Concrete pouring work can be done Tie a 0.2-meter-wide piece of steel and place the correct deposit at a height of 0.075 meters of concrete thickness. 0.5 m long and 19 mm PVC pipe. 0.5 m long and 0.4 m apart - Do not push the cart or drive a concrete mixer truck over the steel wire that is tied across the length and width - Recipients must be watered for at least 7 to 10 days after removing the molded board or covered with concrete bag after 7 to 10 days.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.