Tenders Are Invited For Construction Of 2 Main Concrete Roads, 0.334 Km Long, 5 M Wide, 0.15 M Thick Concrete, Using 8 Mm Steel Cross Section. And Fill The Red Soil, Shoulder Width Of 0.5 M, Be Watered And Compacted By Elephant Foot Or Soil Compactor - The Floor Should Be Paved With Clear Plastic Rubber - The First Foundation Layer Should Be Filled With 0.10 M Thick Red Gravel - The Second Foundation Layer Should Be Filled With 0.10 M Thick Concrete Paving - Concrete Work Can Be Mixed With Concrete Or Concrete Mix 01 Place - 01 Traffic Signs And 02 Project Signs Must Be Installed. 0.5 M Long And 19 Mm Pvc Pipe. 0.5 M Long And Shall Be Spaced 0.40 M Apart - Do Not Push The Cart Or Drive A Concrete Mixer Truck Over The Horizontal And Vertical Ropes - The Recipient Must Cover The Concrete With A Sack Or Filter Cloth And Water For At Least 7 To 10 Days After Removing The Mold.

Tender Detail

112409726
Self-Funded
Tenders Are Invited For Construction Of 2 Main Concrete Roads, 0.334 Km Long, 5 M Wide, 0.15 M Thick Concrete, Using 8 Mm Steel Cross Section. And Fill The Red Soil, Shoulder Width Of 0.5 M, Be Watered And Compacted By Elephant Foot Or Soil Compactor - The Floor Should Be Paved With Clear Plastic Rubber - The First Foundation Layer Should Be Filled With 0.10 M Thick Red Gravel - The Second Foundation Layer Should Be Filled With 0.10 M Thick Concrete Paving - Concrete Work Can Be Mixed With Concrete Or Concrete Mix 01 Place - 01 Traffic Signs And 02 Project Signs Must Be Installed. 0.5 M Long And 19 Mm Pvc Pipe. 0.5 M Long And Shall Be Spaced 0.40 M Apart - Do Not Push The Cart Or Drive A Concrete Mixer Truck Over The Horizontal And Vertical Ropes - The Recipient Must Cover The Concrete With A Sack Or Filter Cloth And Water For At Least 7 To 10 Days After Removing The Mold.
NCB
South-Eastern Asia
Association of Southeast Asian Nations, ASEAN,APAC (Asia Pacific)
13-05-2026

Work Detail

Construction of 2 main concrete roads, 0.334 km long, 5 m wide, 0.15 m thick concrete, using 8 mm steel cross section. And fill the red soil, shoulder width of 0.5 m, be watered and compacted by elephant foot or soil compactor - The floor should be paved with clear plastic rubber - The first foundation layer should be filled with 0.10 m thick red gravel - The second foundation layer should be filled with 0.10 m thick concrete paving - Concrete work can be mixed with concrete or concrete mix 01 place - 01 traffic signs and 02 project signs must be installed. 0.5 m long and 19 mm PVC pipe. 0.5 m long and shall be spaced 0.40 m apart - Do not push the cart or drive a concrete mixer truck over the horizontal and vertical ropes - The recipient must cover the concrete with a sack or filter cloth and water for at least 7 to 10 days after removing the mold.

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document 7276eeae-3ef1-4b91-8782-92a1613a349e.html
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail

WhatsApp