Tenders Are Invited For Construction Of 1 Reinforced Concrete Road, 0.57 Km Long, 4.5 M Wide, 0.15 M Thick Concrete, Using 8 Mm Steel Cross Section. And Fill The Red Soil, Shoulder Width Of 0.5 M, Be Watered And Compacted By Elephant Foot Or Soil Compactor - The Floor Should Be Paved With Clear Plastic Rubber - The First Foundation Should Be Filled With Red Gravel 0.10 M Thick - The Second Foundation Should Be Paved With 0.15 M Thick Concrete Paving - Concrete Work Can Be Mixed With Concrete Or Concrete Mix 01 Place - 1 Traffic Sign And 1 Project Sign Must Be Installed - Concrete Road Paving Work Must Be Tied With A Width Of 0.0 Meters And The Correct Deposit Must Be Placed At A Height Of 0.075 Meters. 0.5 M Long And 19 Mm Pvc Pipe. 0.5 M Long And Shall Be Spaced 0.40 M Apart - Do Not Push The Cart Or Drive A Concrete Mixer Truck Over The Horizontal And Vertical Ropes - The Recipient Must Cover The Concrete With A Sack Or Filter Cloth And Water For At Least 7 To 10 Days After Remov
Tenders Are Invited For Construction Of 1 Reinforced Concrete Road, 0.57 Km Long, 4.5 M Wide, 0.15 M Thick Concrete, Using 8 Mm Steel Cross Section. And Fill The Red Soil, Shoulder Width Of 0.5 M, Be Watered And Compacted By Elephant Foot Or Soil Compactor - The Floor Should Be Paved With Clear Plastic Rubber - The First Foundation Should Be Filled With Red Gravel 0.10 M Thick - The Second Foundation Should Be Paved With 0.15 M Thick Concrete Paving - Concrete Work Can Be Mixed With Concrete Or Concrete Mix 01 Place - 1 Traffic Sign And 1 Project Sign Must Be Installed - Concrete Road Paving Work Must Be Tied With A Width Of 0.0 Meters And The Correct Deposit Must Be Placed At A Height Of 0.075 Meters. 0.5 M Long And 19 Mm Pvc Pipe. 0.5 M Long And Shall Be Spaced 0.40 M Apart - Do Not Push The Cart Or Drive A Concrete Mixer Truck Over The Horizontal And Vertical Ropes - The Recipient Must Cover The Concrete With A Sack Or Filter Cloth And Water For At Least 7 To 10 Days After Remov
Association of Southeast Asian Nations, ASEAN,APAC (Asia Pacific)
13-05-2026
Work Detail
Construction of 1 reinforced concrete road, 0.57 km long, 4.5 m wide, 0.15 m thick concrete, using 8 mm steel cross section. And fill the red soil, shoulder width of 0.5 m, be watered and compacted by elephant foot or soil compactor - The floor should be paved with clear plastic rubber - The first foundation should be filled with red gravel 0.10 m thick - The second foundation should be paved with 0.15 m thick concrete paving - Concrete work can be mixed with concrete or concrete mix 01 place - 1 traffic sign and 1 project sign must be installed - Concrete road paving work must be tied with a width of 0.0 meters and the correct deposit must be placed at a height of 0.075 meters. 0.5 m long and 19 mm PVC pipe. 0.5 m long and shall be spaced 0.40 m apart - Do not push the cart or drive a concrete mixer truck over the horizontal and vertical ropes - The recipient must cover the concrete with a sack or filter cloth and water for at least 7 to 10 days after removing the mold.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.