Tenders Are Invited For Construction Of 2 Concrete Roads, 0.70 Km Long, 4 M Wide, 0.15 M Thick Concrete, Using Steel Rods With A Diameter Of 8 Mm. And Fill The Red Soil, Shoulder Width 0.3 M, Be Watered And Compacted By Elephant Foot Or Soil Compactor - The Floor Should Be Paved With Clear Plastic Rubber - The First Foundation Layer Should Be Filled With Red Gravel 0.10 M Thick - The Second Foundation Layer Should Be Filled With Crushed Stone (Concrete) Thickness 0.15 M - Concrete Work Can Be Mixed Concrete Or Concrete - 6 Bicycles Should Be Installed To Protect The Road. - Concrete Road Work Must Be Installed. 0.5 M Long And 19 Mm Pvc Pipe. 0.5 M Long And Shall Be Spaced 0.40 M Apart - Do Not Push The Cart Or Drive A Concrete Mixer Truck Over The Horizontal And Vertical Ropes - The Recipient Must Cover The Concrete With A Sack Or Filter Cloth And Water For At Least 7 To 10 Days After Removing The Mold.

Tender Detail

112409708
Self-Funded
Tenders Are Invited For Construction Of 2 Concrete Roads, 0.70 Km Long, 4 M Wide, 0.15 M Thick Concrete, Using Steel Rods With A Diameter Of 8 Mm. And Fill The Red Soil, Shoulder Width 0.3 M, Be Watered And Compacted By Elephant Foot Or Soil Compactor - The Floor Should Be Paved With Clear Plastic Rubber - The First Foundation Layer Should Be Filled With Red Gravel 0.10 M Thick - The Second Foundation Layer Should Be Filled With Crushed Stone (Concrete) Thickness 0.15 M - Concrete Work Can Be Mixed Concrete Or Concrete - 6 Bicycles Should Be Installed To Protect The Road. - Concrete Road Work Must Be Installed. 0.5 M Long And 19 Mm Pvc Pipe. 0.5 M Long And Shall Be Spaced 0.40 M Apart - Do Not Push The Cart Or Drive A Concrete Mixer Truck Over The Horizontal And Vertical Ropes - The Recipient Must Cover The Concrete With A Sack Or Filter Cloth And Water For At Least 7 To 10 Days After Removing The Mold.
NCB
South-Eastern Asia
Association of Southeast Asian Nations, ASEAN,APAC (Asia Pacific)
08-05-2026

Work Detail

Construction of 2 concrete roads, 0.70 km long, 4 m wide, 0.15 m thick concrete, using steel rods with a diameter of 8 mm. And fill the red soil, shoulder width 0.3 m, be watered and compacted by elephant foot or soil compactor - The floor should be paved with clear plastic rubber - The first foundation layer should be filled with red gravel 0.10 m thick - The second foundation layer should be filled with crushed stone (concrete) thickness 0.15 m - Concrete work can be mixed concrete or concrete - 6 bicycles should be installed to protect the road. - Concrete road work must be installed. 0.5 m long and 19 mm PVC pipe. 0.5 m long and shall be spaced 0.40 m apart - Do not push the cart or drive a concrete mixer truck over the horizontal and vertical ropes - The recipient must cover the concrete with a sack or filter cloth and water for at least 7 to 10 days after removing the mold.

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document f10623df-80d3-40fb-a60d-c9e799cd5a80.html
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail

WhatsApp