GTR 112409707
Tenders Are Invited For Construction Of 3 Reinforced Concrete Roads, 0.531 Km Long, 5 M Wide, 0.15 M Thick Concrete, Using 8 Mm Steel Cross Section. And Fill The Red Soil, Shoulder Width 0.3 M, Be Watered And Compacted By Elephant Foot Or Soil Compactor - The Floor Should Be Paved With Clear Plastic Rubber - The First Foundation Layer Should Be Filled With Red Gravel 0.10 M Thick - The Second Foundation Layer Should Be Filled With Crushed Stone (Concrete) Thickness 0.15 M - Concrete Work Can Be Mixed Concrete Or Concrete 12 Bicycles Should Be Installed To Protect The Road. - The Work Of Pouring Concrete Road Must Be Tied With A Width Of 0.0 Meters And The Correct Pile Must Be Placed At A Height Of 0.075 Meters. 0.5 M Long And 19 Mm Pvc Pipe. 0.5 M Long And Shall Be Spaced 0.40 M Apart - Do Not Push The Cart Or Drive A Concrete Mixer Truck Over The Horizontal And Vertical Ropes - The Recipient Must Cover The Concrete With A Sack Or Filter Cloth And Water For At Least 7 To 10 Days Af
ICB — International Competitive Bid
Closed
South-Eastern Asia
Tender Information
GTR Reference
112409707
Tendering Authority
Subscribe to view
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction Of 3 Reinforced Concrete Roads, 0.531 Km Long, 5 M Wide, 0.15 M Thick Concrete, Using 8 Mm Steel Cross Section. And Fill The Red Soil, Shoulder Width 0.3 M, Be Watered And Compacted By Elephant Foot Or Soil Compactor - The Floor Should Be Paved With Clear Plastic Rubber - The First Foundation Layer Should Be Filled With Red Gravel 0.10 M Thick - The Second Foundation Layer Should Be Filled With Crushed Stone (Concrete) Thickness 0.15 M - Concrete Work Can Be Mixed Concrete Or Concrete 12 Bicycles Should Be Installed To Protect The Road. - The Work Of Pouring Concrete Road Must Be Tied With A Width Of 0.0 Meters And The Correct Pile Must Be Placed At A Height Of 0.075 Meters. 0.5 M Long And 19 Mm Pvc Pipe. 0.5 M Long And Shall Be Spaced 0.40 M Apart - Do Not Push The Cart Or Drive A Concrete Mixer Truck Over The Horizontal And Vertical Ropes - The Recipient Must Cover The Concrete With A Sack Or Filter Cloth And Water For At Least 7 To 10 Days Af
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
South-Eastern Asia
Political Region
Association of Southeast Asian Nations, ASEAN,APAC (Asia Pacific)
Last Date of Bid Submission
08-05-2026
Closed
Work Detail
Construction of 3 reinforced concrete roads, 0.531 km long, 5 m wide, 0.15 m thick concrete, using 8 mm steel cross section. And fill the red soil, shoulder width 0.3 m, be watered and compacted by elephant foot or soil compactor - The floor should be paved with clear plastic rubber - The first foundation layer should be filled with red gravel 0.10 m thick - The second foundation layer should be filled with crushed stone (concrete) thickness 0.15 m - Concrete work can be mixed concrete or concrete 12 bicycles should be installed to protect the road. - The work of pouring concrete road must be tied with a width of 0.0 meters and the correct pile must be placed at a height of 0.075 meters. 0.5 m long and 19 mm PVC pipe. 0.5 m long and shall be spaced 0.40 m apart - Do not push the cart or drive a concrete mixer truck over the horizontal and vertical ropes - The recipient must cover the concrete with a sack or filter cloth and water for at least 7 to 10 days after removing the mold.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
96fc2275-0c1c-4388-a7ad-35c7a82037af.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.