Tenders Are Invited For Construction Of 1 Main Concrete Road, 0.445 Km Long, 5 M Wide, 0.15 M Thick Concrete, Using 8 Mm Steel Cross Section. And Fill The Red Soil Shoulder Width Of 0.5 M Wide, Be Watered And Compacted By Elephant Foot Or Soil Compactor - The Floor Should Be Paved With Clear Plastic Rubber - The First Foundation Layer Should Be Filled With Red Gravel 0.15 M Thick - The Second Foundation Layer Should Be Filled With Crushed Stone (Limestone) Thickness 0.15 M - Concrete Work Can Use Concrete Mix 2M 01 Place - 01 Traffic Signs And 01 Project Signs Are Required 0.5 M Long And 19 Mm Pvc Pipe. 0.5 M Long And Shall Be Spaced 0.40 M Apart - Do Not Push The Cart Or Drive A Concrete Mixer Truck Over The Horizontal And Vertical Ropes - The Recipient Must Cover The Concrete With A Sack Or Filter Cloth And Water For At Least 7 To 10 Days After Removing The Mold.
Tenders Are Invited For Construction Of 1 Main Concrete Road, 0.445 Km Long, 5 M Wide, 0.15 M Thick Concrete, Using 8 Mm Steel Cross Section. And Fill The Red Soil Shoulder Width Of 0.5 M Wide, Be Watered And Compacted By Elephant Foot Or Soil Compactor - The Floor Should Be Paved With Clear Plastic Rubber - The First Foundation Layer Should Be Filled With Red Gravel 0.15 M Thick - The Second Foundation Layer Should Be Filled With Crushed Stone (Limestone) Thickness 0.15 M - Concrete Work Can Use Concrete Mix 2M 01 Place - 01 Traffic Signs And 01 Project Signs Are Required 0.5 M Long And 19 Mm Pvc Pipe. 0.5 M Long And Shall Be Spaced 0.40 M Apart - Do Not Push The Cart Or Drive A Concrete Mixer Truck Over The Horizontal And Vertical Ropes - The Recipient Must Cover The Concrete With A Sack Or Filter Cloth And Water For At Least 7 To 10 Days After Removing The Mold.
Association of Southeast Asian Nations, ASEAN,APAC (Asia Pacific)
07-05-2026
Work Detail
Construction of 1 main concrete road, 0.445 km long, 5 m wide, 0.15 m thick concrete, using 8 mm steel cross section. And fill the red soil shoulder width of 0.5 m wide, be watered and compacted by elephant foot or soil compactor - The floor should be paved with clear plastic rubber - The first foundation layer should be filled with red gravel 0.15 m thick - The second foundation layer should be filled with crushed stone (limestone) thickness 0.15 m - Concrete work can use concrete mix 2m 01 place - 01 traffic signs and 01 project signs are required 0.5 m long and 19 mm PVC pipe. 0.5 m long and shall be spaced 0.40 m apart - Do not push the cart or drive a concrete mixer truck over the horizontal and vertical ropes - The recipient must cover the concrete with a sack or filter cloth and water for at least 7 to 10 days after removing the mold.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.