Inspection Of Ventilation System – Camera Inspection. The Services Include The Inspection Of Air Conditioning Ducts Using Camera Inspection. These Are Supply And Exhaust Air Ducts From Rlt System 35, Which Were Built Around 1984. The System Is Installed In Lta 6 On The 4Th Floor And Supplies Rooms On The 2Nd And 3Rd Floors. The Sewer Network Is Made Of Galvanized Sheet Metal And Runs Both On And Under Plaster And Within Shafts. The Traffic Must Be Carried Out For Both Horizontal And Vertical Sewer Networks. In Addition, The Massive External And Exhaust Air Shafts Of The Rlt Center 2 Must Be Inspected. These Lead From The Basement To A Shaft Head On The Roof And Are Only Accessible Via The Weather Protection Grilles On The Shaft Head. The Aim Of The Investigations Is To Determine Whether The Sewer Network Can Be Preserved In Whole Or In Part For The Continued Operation Of The Air Conditioning System Or Whether A Comprehensive Replacement Of The Installation Is Necessary.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.