Construction Work – Kannelmäki Church Repair And New Parish Center Construction Work. Kannelmäkis Current Church And Parish Center Were Completed In 1968 And Were Designed By Martti And Marjatta Jaatinen. The Church Has Been Protected By A Decision Of The Church Board In 2004. The Protection Also Includes The Fixed Interior Of The Church, The Related Paintings And Works Of Art, And The Courtyard. The Protection Has Also Applied To The Parish Center Facilities (The Protection Decision Has Been Lifted And The Building Has A Valid Demolition Permit), As Well As The Courtyard Structures To The Extent That They Affect The Experience Of A Visitor To The Kannelmäki Church Or An Observer Of The Church. The Planning Area Is Part Of A Nationally Significant Built Cultural Environment (Rky, Kannelmäki Church). Church Repairs The Helsinki Parish Association (Hereinafter The Procurement Entity / Customer) Requests A Contract Bid For The Repair Of The Kannelmäki Church, The Demolition Of The Old Parish Center And The Construction Contract For The New Parish Center. The Repairs Of The Church Include Parts Of Concrete Structure Repairs, Thorough Repair Of Glass Walls With New Heated Glass, Repair Of Drainage, Sewage And Ventilation Terminal Equipment, As Well As Renewal Of Electricity, Lighting, Building Automation And Av Technology. As Far As The Church Is Concerned, The Repair Is Not A Complete Overhaul, But The Repairs Are Targeted. The Surfaces Of The Church Are Mainly Pure Concrete, Glass And Copper. The Area Of The Church Is About 800 Square Meters. Repairs To Church Facades Require Scaffolding And Protective Covering Outside The Church. Demolition Of The Old Church Center And Construction Of The New Church Center The Existing Church Building (Approx. 1,890 Brm²), Which Is To Be Demolished, Except For The Civil Shelter And One Iv Machine Room, Is To Be Replaced With A New Building. The New Building Has An Area Of Approximately 1,990 Brm². The Mainly Two-Story New Building Would House All Facilities For Parish Functions. The New Parish Center Will Be Located Mainly At The Site Of The Demolished Building. The Starting Point Has Been A Rectangular Building Figure Like The Present One, Which Acts As A Base For The Church. The Glass Hinged Part Between The Church And The Parish Center Will Be Realized As A Single Floor, The Lobby Of The Building As A High Part, And The Elevator Will Be Placed On The Side Of The New Building. Access To The Church Takes Place Along A Narrow Glass Corridor On The Floor Level Of The Church. The New Building Has Two Normal-Height Floors And A Higher Hall At The End, On The Roof Of Which Condensers And Other Technical Equipment Can Be Hidden. In This Way, The Eaves Can Be Kept In Such A Way That The New Building Still Submits To The Volume Of The Church Itself In Accordance With The Requirements: The Eaves Remains Almost Original. The Cross-Sectional Shape Of The Building Is Simpler Than The Original And The Depth Of The Original 2Nd Floor Throughout. The New Building Has A Precast Concrete Frame. The Facade Of The Building On The Side Of The Churchyard And At The Ends Has A Brick-Like Concrete Facade. The Premises Of The Building Open In The Direction Of The Parking Lot To The Northwest. The Long Facade In This Direction Is A Concrete-Copper-Glass Facade. Vesicas
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.