Dismantling Of The Laminate Floor (Including Labor), Removing Tiles From Walls (Including Labor), Removal Of Leveling Layer H=100Mm (Including Labor), Dismantling The Toilet (Including Labor), Dismantling The Sink (Including Labor), Dismantling Doors (Including Labor), Dismantling Aristo (Including Labor), Garbage Transportation To A Distance Of 15 Km (Including Labor), Brickwork Of Internal Walls 100 Mm (Material And Labor Included), Payasa Over The Door 200X200, Plastering Of Walls With Sand-Cement Mortar (Material And Labor Included), Providing Leveling Layer To S/Q Floor H=100 (Material And Labor Included), Laying Of A Driving Waterproofing Layer (Isolatex) On The S/Q Floor, Including Material And Labor, S/Q Floor Covering With Ceramic Granite (Material And Labor Included), S/Q Wall Tiling (Material And Labor Included)
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.