The Subject Of The Performance Is The Implementation Of New Branches Of The Hot Water Line In The Central Heat Supply System (Czt) In The Town Of Slavičín, In The Scope Of The Centre Branch And The Hrádecká Branch, As One Functional Unit. The Heat Pipe Will Be Made As A Ductless, Pre-Insulated Pipe Laid Directly In The Ground, Including All Fittings, Fittings, Protectors, Under-Pressure Under Roads, Earthworks, Connection To The Existing Network, Pressure Tests, Ndt Checks And Commissioning. The Total Length Of The New Pipeline Is Approximately 1,200 M (Sum Of Both Branches). Operating Parameters: Hot Water, Pn 16, Calculation Temperature 105 °C. Part Of The Performance Is In Particular Earthwork, Excavation, Penetrations Under Roads, Installation Of Steel Protectors, Installation Of Pipes, Fittings And Fittings, Connection To The Existing Czt Network, House Transfer Stations, Pressure Tests, Non-Destructive Inspection Of Welds (Min. 10% X-Ray), Geodetic Surveying Of The Actual Design, Restoration Of The Affected Surfaces And Putting The Work Into Operation. Heating Will Take Place During The Full Operation Of The Heating Plant (Boiler Plant) K3, Which Is The Source Of Thermal Energy For The Chp, And Also During The Operation Of Individual Connected Buildings.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.