GTR 112200025
Tenders Are Invited For Improving The Energy Efficiency Of The Volunteer Fire Department Building In Manasterze In The City And Commune Of Jawornik Polski
ICB — International Competitive Bid
Closed
central europe
Tender Information
GTR Reference
112200025
Tendering Authority
Subscribe to view
Tender No
RRG.271.1.2.2026.AS
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Improving The Energy Efficiency Of The Volunteer Fire Department Building In Manasterze In The City And Commune Of Jawornik Polski
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
08-05-2026
Closed
Work Detail
1) The Subject Of The Order Is The Thermal Modernization Of The Building Of The Volunteer Fire Department In Manasterz, Located At The Following Address: Manasterz 574, 37-230 Kańczuga, Plot No. 3179, 3180/1, Manasterz District2) This Task Includes Works Aimed At Optimal Thermal Modernization Of The Public Utility Building In Question. Their Scope Includes Only Works Resulting From The Developed Energy Audit, Such As: 2.1 Thermal-Humidity Insulation Of The Buildings Foundations On An Area Of 99.72 M2 Along With Drainage Drainage; 2.2. Insulation Of The External Walls Of The Building With Polystyrene Foam. 15 Cm On An Area Of 523.91 M2 And Construction Of The Facade; 2.3 Replacement Of Window Frames (22 Pieces With An Area Of 29.07 M2) With External And Internal Window Sills And Installation Of External Blinds (External Solar Screens) - 5 Pieces; 2.4 Replacement Of Door Joinery (External Doors - 3 Pieces, With An Area Of 8.97 M2 And Garage Gates - 2 Pieces, With An Area Of 23.3 M2); 2.5 Insulating The Ceiling Under The Unheated Attic With Styrofoam Thickness. 15Cm On An Area Of 252.80M2; 2.6 Modernization Of The Heating System (Replacement Of The Tiled Stove And Gas Boiler With A Highly Efficient 22Kw Air-Water Heat Pump Supported By Cogeneration (Installation Of A 25Kw Cogenerator). 2.7 Installation Of Air Heat Pumps (Split Air Conditioners With Heating Function With A Capacity Of 7Kw - 3 Sets And 2.5Kw - 5 Sets). 2.8 In Terms Of Modernization Of The Installation Heating, It Is Planned To Replace The Radiators With 25 Panel Radiators, Equipped With Thermostatic Heads, And Replace The Pipes With Their Insulation - Approximately 380 M2. 2.9 Equipping The Boiler Room With Weather Regulation 2.10 Installing An Energy Management System In The Building); 2.11 Installation Of A Pv Installation With A Capacity Of 19.8 Kwp, (Partly On The Roof Of The Existing Mushroom And Partly On The Ground - Destination To Be Agreed With The Ordering Party) 2.12 Installation Of A 10 Kwh Energy Storage, 2.13 Monitoring Of Electricity Consumption, 2.14 Replacement Of Lighting With Led - 50 Pcs. 2.15 Modernization Of The Hot Water Installation (Replacement And Insulation Of Pipes, Use Of A Tank 200L, Implementation Of A Schedule-Controlled Hot Water Circulation System, Installation Of A Thermal Energy Storage Facility - Water Buffer).2.16 Retrofitting The Building With A Visual Identification System (Markings, Pictograms)2.17 Installation Of A Stair Platform2.18 Adaptation Of The Toilet To The Needs Of Disabled People In Accordance With The Architectural Standard2.19 Replacement Of The Roof Covering In The Volunteer Fire Department Building (Excluding The Tower) With Trapezoidal Sheet Metal - Wood On The Side Investors 2.20 Construction Of A Roof Soffit 2.21 Installation Of A Roof Membrane 2.22 Finishing And Reconstruction Works (Including Plastering, Painting) 2.23 Land Development 3) When Preparing The Valuation Of The Works, The Contractor Is Obliged To Tak
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
4fdded84-88ca-49fd-a2b1-2c789689c247.html
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.