GTR 112152386

Tenders Are Invited For Heating, Ventilation And Air-Conditioning Installation Work – Heating And Refrigeration Systems

ICB — International Competitive Bid Closed Western Europe
Tender Information
GTR Reference
112152386
Tendering Authority
Subscribe to view
Tender No
279867-2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Heating, Ventilation And Air-Conditioning Installation Work – Heating And Refrigeration Systems
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union,G20
Last Date of Bid Submission
26-05-2026 Closed
Work Detail
Heating, Ventilation And Air-Conditioning Installation Work – Heating And Refrigeration Systems. The Energy Supply To The Expanded Control Center Will Be Set Up As A Central System For Heating And Cooling. Production Takes Place Via A Monoblock Refrigeration Machine And A Polyvalent Monoblock Heat Pump Outdoors, As Well As Via District Heating. The Polyvalent Heat Pump Is The Main Source Of Heating And Cooling For The Building. The Monoblock Refrigeration Machine And The District Heating Are Used To Cover Peak Loads And To Ensure Redundancy In Energy Production. The Central Distribution For Heating And Cooling Is In The Middle Wing. The New Control Center Building, The Middle Wing And The Office Wing Are Supplied From There. The Control Center Area Is Supplied By Circulating Air Cooling Units As Well As Heating And Cooling Ceilings. While The Circulating Air Cooling Units Provide The Required Cooling Capacity For The Control Center Operation, The Heating And Cooling Ceilings Are Used To Control The Basic Temperature Of The Rooms. Radiators Are Also Installed In The Stairwell. The Office Wing Is Supplied With Underfloor Heating. The Cold Distribution In The Office Wing Will Be Renewed As Part Of The Construction Project And Then Connected To The Central Cooling Supply. The Heating And Cooling Piping Is Made Of Steel. Insulation And Fire Protection Of The Systems Are Part Of This Award Unit. The Heating Pipes Are Predominantly Insulated With Mineral Wool, The Cooling Pipes With Elastomer Foam. There Are Interfaces When Connecting The Series Cooling Devices. The Connecting Cables To The Devices Are Manufactured By The Contractor Hzg/Klt. The Building Automation Takes Over The System And Room Control As Well As The Interconnection Of The Generation Components. High-Performance Customers Receive The Power Connection From The Elt Trade, While The Electrical Connections Are Connected By The Contractor Hzg/Klt.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
a7cd1087-5c22-4196-a6ac-0290cdeaef3e.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders