GTR 112143179

Tenders Are Invited For Modernization Of The Water Supply System, Including Intake, Treatment And Transmission Of Water In Mof Parczew

ICB — International Competitive Bid Closed central europe
Tender Information
GTR Reference
112143179
Tendering Authority
Subscribe to view
Tender No
DUK/1/2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Modernization Of The Water Supply System, Including Intake, Treatment And Transmission Of Water In Mof Parczew
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
07-05-2026 Closed
Work Detail
Part 1 Of The Order - Reconstruction Of The Water Supply Network In Parczew. 1) The Subject Of The Order Is The Performance Of Construction Works For The Ordering Party, Including The Reconstruction Of The Water Supply Network In Wodociągowa And Lubartowska Streets In Parczew. Reconstruction Of The Water Supply Network Along Wodociągowa Street Will Involve Replacing The Existing Water Pipeline With A Diameter Of 400 Mm With A New One Made Of Pe Rc Sdr11 Pn16 355X32.2 Mm Plastics. The Water Pipeline Will Be Laid Along The Route Of The Existing Network Using The Open Excavation Method. The Passage Under Lubartowska Street Will Be Made By Replacing The Existing Water Supply In The Existing Protective Pipe With A Diameter Of 400 Mm. The Protective Pipe Under The Road Remains Unchanged. New Pipeline Made Of Pe Rc Sdr11 Pn16 315X28.6Mm Pipes. The Water Pipeline Will Be Laid Along The Route Of The Existing Water Pipeline. The Reconstruction Along Lubartowska Street Will Involve Replacing The Existing Water Pipeline With A Diameter Of 300 Mm With A New One Made Of Pe Rc Sdr11 Pn1g 315X28.6 Mm Plastics. The Water Pipeline Will Be Laid Partly Along The Route Of The Existing Water Pipeline. The Area Where Construction Works Will Be Carried Out Is Partially Built-Up (Service And Residential Buildings). Therefore, In Order To Limit Interference With The Existing Development Of The Area, The Works Will Be Mostly Performed Using The Trenchless Method Using Horizontal Directional Drilling. The Passage Under The Surface Flowing Waters Of The Piwonia River Will Be Made Using Two Parallel Passages Under The Bottom Of The Piwonia River. Two Parallel Pe Rc Sdr11 Pn16 315X28.6Mm Pipelines In Protective Pipes Will Be Installed Using Horizontal Directional Drilling. 2) Carrying Out Surveying Services; 3) Preparation Of As-Built Documentation Containing: Protocols Of Final Tests And Decay Works, As-Built Inventory - Adopted In The Appropriate Surveying Center, Construction Design With Changes Introduced; 4) Obtaining, On Behalf Of The Ordering Party, An Invalid Occupancy Permit Or A Certificate Of Lack Of Grounds To Object To The Notification Of The Construction Supervision Authority About The Completion Of Construction; 5) Get Acquainted With The Area Where The Works Will Be Carried Out, Access Roads And Obtain For Yourself And At Your Own Responsibility And Risk All Information That May Be Necessary In Preparing The Offer And For The Valuation Of The Works, As The Possibility Of Claims For Underestimation, Omission Or Failure To Recognize The Scope Of The Subject Of The Order Is Excluded.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
81262671-e272-472c-a86e-f9bc506a8fe2.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders