2. The Subject Of The Order Is The Preparation Of Design Documentation Based On The Functional And Utility Program Developed By The Ordering Party (Construction Design, Technical Designs, Technical Specifications For The Execution And Acceptance Of Construction Works, Outlay Cost Estimates, Offer Cost Estimates And Bills Of Quantities), Obtaining The Necessary Consents, Decisions, Permits And Arrangements And, On Their Basis, Carrying Out Construction Works, Assembly Of Small Architecture Elements And A Playground.3. The Scope Includes Obtaining A Final Decision On A Building Permit Or Reporting Construction Works In Accordance With The Provisions Of The Construction Law And Obtaining An Occupancy Permit Or No Objection From The Construction Supervision Authority To The Notification Of Completion Of Construction.4. Scope Of Work: 1) Development Of A Construction Design, 2) Development Of Technical And Executive Designs, 3) Development Of Technical Specifications For The Execution And Acceptance Of Construction Works, 4) Development Of Bid Cost Estimates, 5) Development Of All Necessary Industries, Including: Road Industry, Installation Industry (Including Lighting, Monitoring), 6) Obtaining On Behalf Of The Ordering Party All Necessary Consents, Decisions, Conditions, Opinions, Expert Opinions, 7) Execution Of As-Built Projects, Including Surveying Report,8) Performance Of Construction Works, Assembly Works, Supplies Of Devices, Equipment, Equipment,9) Obtaining Documents Necessary For The Use Of The Facility.6. When Developing Construction And Executive Designs, The Contractor Is Obliged To Take Into Account All Necessary Elements And Their Finishing, As Well As Works Aimed At Completing A Complete Task, Serving Its Intended Purpose And Enabling Its Use. 7. The Ordering Party Indicates That The Task Will Be Carried Out In The Design And Build Formula, Therefore Elements Not Described In The Functional And Utility Program But Necessary Due To The Function Of The Facility, Technical Conditions, Legal Regulations, Including Safety And Fire Protection, Etc. Must Be Taken Into Account Both By The Designer At The Design Stage And The Contractor At The Execution Stage.8. The Investment Includes Comprehensive Site Development Works, Including Demolition Works, General Construction And Finishing Works, Including All Necessary Installations Necessary For The Proper Functioning Of The Area.11. The Detailed Requirements Of The Ordering Party Regarding The Facility, The Scope And Size Of Design Works And Construction Works Are Specified In The Functional And Utility Program.