Pipeline-Inspection Services – Internal Inspection Of The Dn 1400 Pipeline. The Subject Of The Contract Is To Carry Out An Internal Inspection Of The Gas Pipeline For The Purpose Of Collecting Data From The Lines Of The Transmission Network, With The Help Of Which The Technical Condition Of The Operating Lines Is Monitored In Accordance With The Asme B31g Standard Using The Magnetic Flux Leakage (Mfl) Technique. Carrying Out An Internal Inspection On 4 Sections Of The 4Th Line Of The Dn 1400 / 56 Gas Pipeline With A Total Length Of 448.2 Km: I. Section 1: Ks01 – Ks02 In The Length Of 112.1 Km; Ii. Section 2: Ks02 – Ks03 In The Length Of 110.7 Km; Iii. Section 3: Ks03 – Ks04 In 112.7 Km Long: Ks04 – 112.7 Km Long Internal Pipeline Inspections Consist Of The Following Activities: A) Mobilization Of The Inspection Equipment To The Inspection Site. C) Delivery Of The Operational Report Processing And Delivery Of The Final Report For Each Section According To Asme B31g Standards. The Cleaning Of The Dn 1400 Pipeline Will Be Carried Out By The Company With The Installed Calibration Plate, So That It Is Not Necessary To Run The Pipeline Also Carry Out A Run With The Suppliers Profile Equipment Before The Inspection Run.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.