1. The Subject Of The Order Is The Construction Of Economic And Technical Facilities Along With Auxiliary Facilities, Outside The Open-Air Museum Tour Area. The Designed Building Will Be Constructed On An Undeveloped Plot, In A Wooded Area, 150 M From The Nearest Exhibition Building Of The Open-Air Museum. Designed Area Combined Building With A Shelter Is 300.7 M² - Development Area, Area. Usable Area With A Shelter - 275.2 M2, Volume 1185.5 M3. Investment Address: 87-840 Lubień Kujawski, Kłóbka, Registration Unit City Of Włocławek, Registration District 0020 Kłóbka, Number: 041811-5.0020.163/1 Lubień Kujawski Rural Area (As A Plot No. 163/1), Investor: Museum Of The Kujawy And Dobrzyń Lands In Włocławek, Ul. Słowackiego 1A, 87-800 Włocławek Information Regarding The Work: Construction Works Will Be Carried Out On An Active Facility! Separate Access To The Construction Site Will Be Provided. The Subject Of The Order Includes In Particular: A) Preparatory Works - Tree Cutting - Macroniwelation B) General Construction And Electrical Industry - Earthworks - Foundations - Steel Structure Of The Hall - Subfloors And Floors - Covering Roof - Reconstruction Of Walls - Joinery - Insulation And Internal Casing - Chimney - Trim - Electrical Installations (Including: Sswin, Cctv) - Hardeningc) Installation Works (In Particular: Water Supply)2. A Detailed Description Of The Subject Of The Order, The Scope Of Work And The Method Of Their Implementation Are Specified In The Annexes To The Swz, Including: 1) Construction Designs (Annex No. 8); 2) Technical Specification For The Execution And Acceptance Of Works - Stwior (Annex No. 9); 3) Additionally, Bills Of Quantities (Annex No. 10); The Basis For Preparing The Offer Cost Estimate, Which Will Constitute An Annex To The Contract, Is The Design Documentation (Annex No. 8, 9 And 10 To Swz). Attention! An Inventory Of The Project Was Made In Terms Of Compliance With The List Of Devices That Will Be Installed In The Building. Replacement Documentation For The Existing Project Was Prepared. The New Arrangement Is Indicated In Fig. 1 - Supplement - Electrical Installation And Fig. 3 - Supplement - Electrical Installation. The Bill Of Quantities For Electrical Works Should Be Verified And Supplemented With The Conclusions Resulting From The Additionally Attached Above-Mentioned Drawings. The Offer Cost Estimate Will Constitute The Basis For Calculating The Contractors Remuneration Due To Him For The Performance Of The Order Or Part Of The Order In The Event Of Withdrawal From The Contract, Remuneration For Possible Security For Interrupted Works Or Calculating The Value Of Abandoned Works And Settlement With The Managing Authority Of The Funds Received For The Implementation Of The Order. When Implementing The Subject Of The Order, The Contractor Will Be Obliged To Use Only Products Approved For Use In Construction Within The Meaning Of The Act Of July 7, 1994, Construction Law (Journal Of Laws Of 2021, Item 2351, A
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.