Tenders Are Invited For Design, Supply, Installation, Testing, And Commissioning Etc All Complete As Required For The Establishment Of Battery Energy Storage System (Bess) In 4 (Four) Substations With 10 Mwh Capacity (Dhaka-1, Mymensingh-2, Kishoreganj, And Narsingdi-1 Pbs) Each On A Turnkey Basis.
Tenders Are Invited For Design, Supply, Installation, Testing, And Commissioning Etc All Complete As Required For The Establishment Of Battery Energy Storage System (Bess) In 4 (Four) Substations With 10 Mwh Capacity (Dhaka-1, Mymensingh-2, Kishoreganj, And Narsingdi-1 Pbs) Each On A Turnkey Basis.
South Asian Association for Regional Cooperation (SAARC),APAC (Asia Pacific)
04-06-2026
Work Detail
Design, Supply, Installation, Testing, And Commissioning Etc All Complete As Required For The Establishment Of Battery Energy Storage System (Bess) In 4 (Four) Substations With 10 Mwh Capacity (Dhaka-1, Mymensingh-2, Kishoreganj, And Narsingdi-1 Pbs) Each On A Turnkey Basis.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.