Tenders Are Invited For Scope Of Workprovide Full Duplex Dedicated Internet Bandwidth:Banbeis Central Office (Dhaka): 300 Mbpseach Uitrce (125 Locations): 30 Mbpsthe Vendor Will Be Fully Responsible For All Installation-Related Civil Works, Including:Excavation, Trenching, Tunnelinglaying And Testing Fiber Optic Cablesthe Vendor Must:Install And Configure Odf, Joint Enclosures, Media Converters, And Networking Devicesproperly Label And Organize All Cabling (No Exposed Or Hanging Wires)Install Permanent Route Markers To Prevent Fiber Damageprovide Basic Hands-On Training To Banbeis And Uitrce Staff For Minor Troubleshooting.Installation And Implementationcomplete Installation And Commissioning Within 15 Days From Contract Award.Conduct A Site Survey For All Locations And Submit A Report Including:Fiber Layout Planresource Deployment Planwork Schedule And Timelinedeploy Qualified Technical Personnel For Installation, Configuration, And Testing.Service Level Agreement (Sla)Uptime: Minimum
Tenders Are Invited For Scope Of Workprovide Full Duplex Dedicated Internet Bandwidth:Banbeis Central Office (Dhaka): 300 Mbpseach Uitrce (125 Locations): 30 Mbpsthe Vendor Will Be Fully Responsible For All Installation-Related Civil Works, Including:Excavation, Trenching, Tunnelinglaying And Testing Fiber Optic Cablesthe Vendor Must:Install And Configure Odf, Joint Enclosures, Media Converters, And Networking Devicesproperly Label And Organize All Cabling (No Exposed Or Hanging Wires)Install Permanent Route Markers To Prevent Fiber Damageprovide Basic Hands-On Training To Banbeis And Uitrce Staff For Minor Troubleshooting.Installation And Implementationcomplete Installation And Commissioning Within 15 Days From Contract Award.Conduct A Site Survey For All Locations And Submit A Report Including:Fiber Layout Planresource Deployment Planwork Schedule And Timelinedeploy Qualified Technical Personnel For Installation, Configuration, And Testing.Service Level Agreement (Sla)Uptime: Minimum
South Asian Association for Regional Cooperation (SAARC),APAC (Asia Pacific)
04-05-2026
Work Detail
Scope Of Workprovide Full Duplex Dedicated Internet Bandwidth:Banbeis Central Office (Dhaka): 300 Mbpseach Uitrce (125 Locations): 30 Mbpsthe Vendor Will Be Fully Responsible For All Installation-Related Civil Works, Including:Excavation, Trenching, Tunnelinglaying And Testing Fiber Optic Cablesthe Vendor Must:Install And Configure Odf, Joint Enclosures, Media Converters, And Networking Devicesproperly Label And Organize All Cabling (No Exposed Or Hanging Wires)Install Permanent Route Markers To Prevent Fiber Damageprovide Basic Hands-On Training To Banbeis And Uitrce Staff For Minor Troubleshooting.Installation And Implementationcomplete Installation And Commissioning Within 15 Days From Contract Award.Conduct A Site Survey For All Locations And Submit A Report Including:Fiber Layout Planresource Deployment Planwork Schedule And Timelinedeploy Qualified Technical Personnel For Installation, Configuration, And Testing.Service Level Agreement (Sla)Uptime: Minimum 99.9% For All Locationspacket Loss: Maximum 0.1%Time To Repair (Ttr):Metro Areas (E.G., Dhaka): Within 4 Hoursupazila Locations: Within 24 Hoursmonitoring & Security:Proactive Network Monitoring With Alert Systembuilt-In Ddos Protectionnetwork Redundancy:Multiple Fiber Pathsredundant Core Routersredundant Last-Mile Connectivity For Uitrce Locationsonline Reporting:Web-Based Real-Time Bandwidth Monitoring Dashboardmrtg Access For Banbeis And Uitrce Staffsupport Services:24/7 Network Operations Center (Noc)Single Point Of Contact (Spoc) For All Incidents
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.