The Town Of Banff Water Services Department Aims To Replace Existing 4” Ductile Iron Piping With Stainless Steel To Prevent Any Unexpected Loss Of Containment. This Piping Replacement Will Start At The Primary Sludge Pumps Located In The Discharge Of The Primary Scum Pump (Drawing 3P7 – P&Id) Primary Gallery And Will End At The Scum Drum (Drawing 3P9 – P&Id).The Contractor Will Be Responsible For Suppling All Material.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.