The Order Is For Construction And Includes The Following Construction And Assembly Works: Dismantling Works: Breaking (Dismantling) Pavements, Etc.; Excavation Works; Water Extraction; Reinforcement Of Trenches (If Necessary); Dismantling And Demolition Of The Existing Pipeline Systems (Networks And Facilities); Loading And Removal Of Earth Masses And Waste To A Regulated Landfill (Landfill) And Other Activities. Construction And Installation Works For The Construction Of External Sewage Systems (Networks And Facilities): Earthworks (Excavation And Compaction Works); Reinforcement Of Trench (If Necessary); Water Extraction; Laying A Sand Cushion; Laying Of The External Pipeline (Sewage) System (From Hdpe Double-Layer Corrugated Channel Pipes And Shaped Parts And Elements); Laying Warning Tape; Construction/Installation Of Inspection Manholes Made Of Pp, From Ready-Made Stb Elements With Protective Covers For Manholes (Cast Iron), Corresponding To The Load Class - Class D400; Testing Of The Pipeline - Checking For Tightness Of The Constructed Sewage System Before Laying The Backfill; Waterproofing Of Stb Rsh; And Other Activities. Acts And Protocols During The Construction Of The Mrrd To The Zut), Without Remarks. The Warranty Period Of The Executed Smr - Not Shorter Than 8 (Eight) Years, Counted From The Date Of Signing The Ascertainment Act To Establish The Suitability For Acceptance Of The Construction (Revision 15) According To Ordinance No. 3 Of The Mrrd To The Zut Without Comments From A Committee Appointed By The Contracting Authority For The Acceptance Of The Object.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.