Tenders Are Invited For Architectural, Construction, Engineering And Inspection Services - Acting As An Investors Supervision Inspector For The Implementation Of The Small Lowland Retention Project (Mrn3) In The Złoty Potok Forest District
Tenders Are Invited For Architectural, Construction, Engineering And Inspection Services - Acting As An Investors Supervision Inspector For The Implementation Of The Small Lowland Retention Project (Mrn3) In The Złoty Potok Forest District
Architectural, Construction, Engineering And Inspection Services - Acting As An Investors Supervision Inspector For The Implementation Of The Small Lowland Retention Project (Mrn3) In The Złoty Potok Forest District. 4.1. The Subject Of The Order Is Performing The Function Of An Investors Supervision Inspector For The Implementation Of The Small Lowland Retention Project (Mrn3) In The Złoty Potok Forest District 4.2. Small Retention Means Activities That Improve The Ability To Collect Water In Small Natural And Artificial Reservoirs And Its Damming In River Beds, Streams, Canals And Ditches For Subsequent Alimony To The Environment. The Aim Of Implementing Construction Investments Based On The Design Documentation Will Be Primarily To Improve The Moisture Of Forest Soils, Change The Unfavorable, Rapid Outflow Of Surface Water From Forest Areas Into A Slower Outflow, Diversify The Elements Of The Forest Ecosystem And Have A Beneficial Impact On Biodiversity. 4.3. Names And Codes Relating To The Subject Of The Contract Determined In Accordance With The Common Procurement Vocabulary (Cpv): 71000000-8 - Architectural, Construction, Engineering And Inspection Services 71520000-9 - Construction Supervision Services 4.4. The Order Was Not Divided Into Partial Tasks Due To The Fact That It Constitutes One Of The Parts Of The Order Awarded By Various Ordering Parties (Units Of The State Forests National Forest Holding) Participating In The Project Comprehensive Project For The Adaptation Of Forests And Forestry To Climate Change - Small Retention And Counteracting Water Erosion In Lowland Areas - Continuation (Mrn3). Dividing The Order Into Partial Tasks And Concluding Several Contracts With Different Contractors Is Unjustified For Technical And Organizational Reasons (Difficulties In Settling Many Contracts Within The Project). Due To The Scope Of The Construction Of Small Retention Facilities In The Złoty Potok Forest District, The Order Related To Performing The Function Of A Supervision Inspector Can Be Completed By An Entrepreneur From The Sme Sector. 4.5. Detailed Description Of The Subject Of The Order: 1) The Contractor Will Be Obliged To Perform The Full Scope Of Activities Of The Investors Supervision Inspector Specified In The Provisions Of The Act Of July 7, 1994, Construction Law. The Scope Of The Facilities Planned By The Ordering Party To Be Constructed Under Mrn3 Is Specified In Annex No. 12 To The Swz. 2) The Contractor Will Be Obliged To Inspect And Provide Written Opinions, Within 5 Calendar Days, Provided By The Designer Executing The Order For The Preparation Of Design Documentation, Of All Elements Produced In The Design Process That Are Related To The Verified And Supervised Task At Each Of Its Stages, And To Inspect Corrections Made In Accordance With The Indications; 3) The Contractor Will Be Obliged To Actively Participate In Meetings And Meetings Organized By The Ordering Party During The Preparation Of Design Documentation And During The Implementation Of Construction Works, As Well As In Financial Settlements And Inspections Conducted By Entities Consulting And Financing Investments And Public Administration Bodies; 4) As Part Of The Supervision Over The Proper Execution Of Design Documentation, The Supervision Inspector Will Be Obliged To:
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.