Replacement Of The Electrical Installation - 4Th Stage. This Is A Gradual Total Replacement Of Existing Aluminum Distribution Systems With Copper Ones. The Existing Electrical Installation Will Be Dismantled And Canceled, Including Switchboards. For Time And Financial Reasons, The Reconstruction Will Be Carried Out In Stages, There Should Be Approximately 17 Stages In Total. At Each Stage, It Is Considered That All Installations Must Be Prepared In Such A Way That The Premises Do Not Have To Be Interfered With In Subsequent Stages. All Cables Must Be Prepared So That During The Next Stages There Is No Need To Connect To These Cables In The Substation. This Stage Will Continue With The Replacement Of The Wiring In The Middle Of The 5Th Floor And In The Corridor. The Cables For The Next Stage Will Be Terminated, For Example, In Soffits Or Connected To Existing Distribution Systems So That The Next Stage Can Be Connected As Close As Possible To The Relevant Premises. The Public Contract Is Not Divided Into Parts, Therefore Only Partial Performance Is Not Possible.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.