Disassembly Of 573 Lighting Fixtures · Installation Of 573 Lighting Fixtures With An Intelligent Control System Replacement Of Power Supply Cables For The Fixtures On Both Overhead And Cable Lines (Fuse - Fixture Relationship) – 573 Sets · Replacement Of Fuse Connectors And Fuses On Cable Lines – 108 Sets · Replacement Of Fuse Connectors, Terminals And Fuses On The Lines Overhead Lines - 465 Sets. Replacement Of Booms With Galvanized Single-Arm Arms, 1 M Long, On The Overhead Line - 20 Pcs. Replacing Booms With Galvanized Single-Arm Arms, 1.5 M Long, On The Overhead Line - 6 Pcs. Replacing Astronomical Clocks In Lighting Cabinets - 25 Sets. Installation Of Soft-Start Systems In Lighting Cabinets - 25 Sets. Installation Of Capacitive Reactive Power Compensators In Lighting Cabinets - 25 Sets. · Cutting Out Branches Around The Lighting Fixture - 573 Sets. Preparation Of Intensity And Luminance Measurements For Modernized Lighting, Including Measurement Of Reactive Power Consumption. Preparation Of Designs For Temporary Traffic Organization, Including Its Approval And Implementation (If Required). Preparation Of As-Built Documentation.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.