GTR 111931791
Bids Are Invited For Hiring A Specialized Company To Carry Out Engineering Works For The Construction Of 20 Twenty Housing Units Within The Scope Of The Minha Casa Minha Vida Program – Fhnis Sub 50, In The Municipality Of Turmalinamg, According To Term Of Commitment No. 9930792025Mcidadescaixa And Proposal No. 0399882025Mcidadescaixa, To Be Carried Out On Rua 18, Sn, Bairro Nova Turmalina, In Accordance With The Budget Spreadsheet, Physical-Financial Schedule, Projects And Other Technical Documents.
ICB — International Competitive Bid
Closed
South America
Tender Information
GTR Reference
111931791
Tendering Authority
Subscribe to view
Tender No
3/2026
Financer Name
Self-Funded
Work Title
Bids Are Invited For Hiring A Specialized Company To Carry Out Engineering Works For The Construction Of 20 Twenty Housing Units Within The Scope Of The Minha Casa Minha Vida Program – Fhnis Sub 50, In The Municipality Of Turmalinamg, According To Term Of Commitment No. 9930792025Mcidadescaixa And Proposal No. 0399882025Mcidadescaixa, To Be Carried Out On Rua 18, Sn, Bairro Nova Turmalina, In Accordance With The Budget Spreadsheet, Physical-Financial Schedule, Projects And Other Technical Documents.
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
South America
Political Region
BRIC,G20
Last Date of Bid Submission
08-05-2026
Closed
Work Detail
1.1 - Supply And Installation Of Construction Plate With Galvanized Sheet And Wooden Structure. Af_03/2022_Ps:, 1.2 - Conventional Location Of Work, Using Template Of Pointed Running Boards Every 2.00M - 2 Uses. Af_03/2024:, 1.3 - Rental Of Container 2, 30 Backhoe (Including Excavation For Placement Of Forms). Af_01/2024:, 2.2 - Preparation Of The Bottom Of A Trench With A Width Of Less Than 1.5 M (Adjustment Of The Natural Soil). Af_08/2020:, 04/17/2026 - 15:09:19, 04/17/2026 - 15:09:20, 2.3 - Slim Concrete Ballast, Applied To Crowning Blocks Or Footings, 5 Cm Thick. Af_01/2024:, 2.4 - Manufacture, Assembly And Disassembly Of Shoe Formwork, Made Of Resin Plywood Sheet, E=17 Mm, 4 Uses. Af_01/2024:, 2.5 - Insulated Shoe Frame, Baldrame Beam And Running Shoe Using 10 Mm Ca-50 Steel - Assembly. Af_01/2024:, 2.6 - Insulated Shoe Frame, Baldrame Beam And Running Shoe Using 6.3 Mm Ca-50 Steel - Assembly. Af_01/2024:, 2.7 - Insulated Shoe Frame, Baldrame Beam And Running Shoe Using 5 Mm Ca-60 Steel - Assembly. Af_01/2024:, 2.8 - Concreting Shoe, Fck 20 Mpa, Using Jerica - Laying, Densifying And Finishing.:, 2.9 - Manual Backfilling Of Trenches, With Percussion Soil Compactor. Af_08/2023:, 2.10 - Manual Excavation For Baldrame Beam Or Footing (Including Excavation For Placing Forms). Af_01/2024:, 2.11 - Slim Concrete Ballast, 2.12 - Manufacture, Assembly And Disassembly Of Formwork For Baldrame Beam, In Sawn Wood, E=25 Mm, 2.13 - Insulated Shoe Frame, Baldrame Beam And Running Shoe Using 8 Mm Ca-50 Steel - Assembly. Af_01/2024:, 2.14 - Isolated Footing Frame, 2.15 - Isolated Footing Frame, 2.16 - Concreting Of Crowning Block Or Baldrame Beam, Densification And Finishing. Af_01/2024:, 2.17 - Manual Backfilling Of Trenches, 2.18 - Chapisco Applied To Masonry And Internal Concrete Structures, Using A Trowel. Traco 1:3 Mortar With Manual Preparation. Af_10/2022:, 2.19 - Surface Waterproofing With Cement Mortar And Sand, With Waterproofing Additive, E = 1.5Cm. Af_09/2023:, 2.20 - Surface Waterproofing With Asphalt Emulsion, 2 Coats. Af_09/2023:, 3.1 - Assembly And Disassembly Of Rectangular Pillars And Similar Structures, Simple Right-Foot, 8 Uses. Af_09/2020:, 3.2 - Assembly And Disassembly Of Beam Form, Without Propping, In Resin Wood Sheet, 8 Uses. Mm - Assembly. Af_06/2022:, 3.5 - Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using 6.3 Mm Ca-50 Steel - Assembly. Af_06/2022:, 3.6 - Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using 8 Ca-50 Steel, 3.7 - Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using Ca-50 10 Steel, 3.8 - Unidirectional Pre-Molded Slab, Bi-Supported, For Floor, Filling In Ceramic, Conventional Joist, Total Slab Height Lt = 12 Cm (Filling+Cover) = (8+4). Af_08/2025:, 3.9 - Concreting Of Pillars, Fck = 20 Mpa, Using Buckets - Placing, Densifying And Finishing. Af_02
Key Value
Tender Value
3,036,548 - BRL
Tender Documents
Global Tender Document
355a83db-315c-465b-8365-4cd4050ef9ba.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.